Floor & balcony waterproofing for restaurants in Alkharj

Prepared by the technical team · editorial review · last updated 13 November 2026 · Sources

In short: Floor & balcony waterproofing for restaurants in Alkharj starts with the roof, falls and drains survey, then the moisture meter for ceilings and walls, before anything is opened. The centre of Alkharj sits about 439 m above sea level (SRTM open elevation data). Pricing starts from Bathroom waterproofing (per m²) (SAR 15–40 per m²), and other items are quoted after the visit.

What is specific about Alkharj for floor & balcony waterproofing

Main roads in or near Alkharj: King Abdullah Road. The centre of Alkharj sits about 439 m above sea level (SRTM open elevation data).

Team note on Alkharj: Kashf teams serve this city and its nearby districts with the same documented inspection standard: device-based leak detection without demolition, a written report, and a clear scope before any work begins..

Before any quote is given for a restaurant floor or balcony in Alkharj, the first thing a technician checks is the ground the building sits on. The centre of Alkharj sits about 439 m above sea level (SRTM open elevation data), which means the site is not a low-lying flood plain, so standing water is rarely the main concern. What matters more is how water moves across the surface: kitchen floors that are washed down several times a day, drains that back up, and balconies that collect rain from the roof above. Each of these shapes the choice of system, so the first checks focus on slope, drainage points, and where the existing finish has already failed.

Some things can only be settled on the site visit. The technician needs to walk the floor, test for hollow sounds under tiles, find the cracks and measure their length, and look at the edges where the floor meets walls and drains. Whether the work needs a bitumen membrane, spray foam, an epoxy coating, or a liquid system depends on what is found underneath, not on the size of the room alone. For balconies, the visit also confirms whether an XPS board layer is needed to protect the membrane, and whether any existing tiles can be lifted or must go. Pricing for each option is only firm once these conditions are known, because a crack injection job is charged per metre while a coating is charged per square metre.

To help the technician arrive prepared, it is useful to have a few details ready before the visit. Note the area of the floor or balcony in square metres, the length of any visible cracks, and whether the restaurant runs a kitchen, a seating area, or both. Mention when the floor was last resurfaced and whether leaks have been seen below, in a storeroom or on a lower level. If the balcony is open to rain, say which direction it faces and whether a roof sits above it. Clear photos of the surface and the drains help the technician plan the work and reduce surprises on the day.

Service-area map for waterproofing & insulation in AlkharjAlkharj2 kmNSchematic · coordinates from Kashf data
The approximate extent of Alkharj — the exact location of your job is set when you book.

For restaurants, visits are planned outside service hours and recorded for the premises file.

When do you need floor & balcony waterproofing?

The following signs are worth checking before they grow:

Causes we see in the field

Tools and methods, and when we use them

Tool or methodWhat it measuresWhy it is chosen here
Flood testWhether the waterproofing holds before it is coveredLimits: for roofs with drains and wet areas before tiling
Moisture meter for ceilings and wallsWhere water is entering now, from insideLimits: measures the effect, not the water path
Roof, falls and drains surveyPonding areas and the condition of the old layerLimits: shows the condition, not the material alone

From the first visit to the report

  1. Checking the falls: Where water collects and where it should go.
  2. Details: Thresholds, drains and upstands.
  3. Waterproofing: The layer is applied and protected.
  4. Flood test: Tested before the finish goes on.

Facts and costs — Alkharj

ItemValueSource
District profileThe centre of Alkharj sits about 439 m above sea level (SRTM open elevation data)SRTM (NASA) open data
RoadsMain roads in or near Alkharj: King Abdullah RoadKashf data (owner)
District profileTeam note on Alkharj: Kashf teams serve this city and its nearby districts with the same documented inspection standard: device-based leak detection without demolition, a written report, and a clear scope before any work begins.Kashf team
Bathroom waterproofing (per m²)SAR 15–40 per m²Owner price list (Alkharj)

Common questions about floor & balcony waterproofing in Alkharj

Does an underground tank require waterproofing even if it is new?

Yes, concrete is naturally porous, which can lead to leaks or groundwater seepage. Applying epoxy or cementitious insulation from the start maintains water quality and protects the structure from corrosion.

Do you need to evacuate the building during renovation work?

It depends on the type and scope of the work. Surface work such as plastering and painting usually does not require evacuation, while partial or full evacuation may be advised in cases of structural reinforcement, and the contractor determines this after inspection.

Where does floor & balcony waterproofing for restaurants start in Alkharj?

We start with checking the falls (where water collects and where it should go), then details (thresholds, drains and upstands).

What does floor & balcony waterproofing cost in Alkharj?

From our published price list: Bathroom waterproofing (per m²) SAR 15–40 per m². Quantities are confirmed at the inspection.

What do I receive after the work?

The flood result and photos of the details, in a technical report that carries a verification code.

Mistakes that cost more

What you receive

The written output: the flood result and photos of the details. The report is numbered and can be checked with its verification code.

Planning the visit in Alkharj

  • Keep photos of the problem and of any earlier repairs — they help the technician compare before and after.
  • If you rent, tell your landlord or building management before the visit and agree in writing who pays; the written report can be shared with them.
  • Have access ready to the water meter, the tank hatches, the roof and the main valve; in apartment buildings the roof keys are often with the building guard (haris).
  • Prices are in Saudi riyals (SAR); the final price is confirmed after the inspection, before any work starts.