Floor & balcony waterproofing in Allith: before summer & rain season

Prepared by the technical team · editorial review · last updated 13 November 2026 · Sources

In short: Floor & balcony waterproofing (before summer & rain season) in Allith starts with the roof, falls and drains survey, then the moisture meter for ceilings and walls, before anything is opened. The centre of Allith sits about 5 m above sea level (SRTM open elevation data). Published price: Bathroom waterproofing (per m²), SAR 15–40 per m²; anything else is quoted after the inspection.

Before we start: what we know about Allith

The centre of Allith sits about 5 m above sea level (SRTM open elevation data). Allith is about 1.2 km from the sea coast (OpenStreetMap).

Main roads in or near Allith: Al Laith Road, Amr Bin Al Aas Street.

Consider a homeowner in Allith with a flat concrete roof terrace and a first-floor balcony that has started to show faint staining on the ceiling below. Their property is typical of the area: a few years old, with the usual exposure to strong sun in the warmer months and occasional heavy downpours in winter. They want to act before the next season rather than wait for a leak to appear inside the living room.

The local facts matter here. The centre of Allith sits about 5 m above sea level, so rainwater tends to drain away rather than pool in low ground, but a flat roof or balcony with a poor slope will still hold water in its own surface depressions. Allith is also about 1.2 km from the sea coast, which means salt-laden air can reach the surface of exposed concrete and sealants over time, speeding up wear on joints and coatings. For an owner, this points toward choosing a membrane or coating that stays flexible and resists both UV and salt, and toward checking joints and cracks before the rains arrive rather than after.

A sensible sequence starts with a dry inspection. Walk the roof and balcony after a rain and note ponding, hairline cracks, and any lifted or cracked old sealant around drains, parapets and door thresholds. Mark crack lines in chalk, since a crack that runs in a straight line is often the first point of entry. Next, plan the repair. Cracks wider than a hairline can be treated with crack injection, priced per metre, and small defects can be sealed before the main coating goes on. Then decide the surface system. Liquid roof waterproofing suits most open roofs and balconies, while a bitumen membrane may suit heavier-use areas, and the choice should follow the surface and the budget for each square metre. Finally, check the work by ponding a small area with water for a day and confirming that nothing reaches the ceiling below before the summer heat arrives.

Service-area map for waterproofing & insulation in AllithAllith2 kmNSchematic · coordinates from Kashf data
Approximate area of Allith — a schematic that does not show any customer address.

Checks before summer and before the rain season catch problems while they are still small.

Signs worth paying attention to

The following signs are worth checking before they grow:

Causes we see in the field

Tools and methods, and when we use them

ToolWhat it findsWhen we use it in Allith
Flood testWhether the waterproofing holds before it is coveredLimits: for roofs with drains and wet areas before tiling
Roof, falls and drains surveyPonding areas and the condition of the old layerLimits: shows the condition, not the material alone
Moisture meter for ceilings and wallsWhere water is entering now, from insideLimits: measures the effect, not the water path

From the first visit to the report

  1. Checking the falls: Where water collects and where it should go.
  2. Details: Thresholds, drains and upstands.
  3. Waterproofing: The layer is applied and protected.
  4. Flood test: Tested before the finish goes on.

Facts and costs — Allith

ItemValueSource
District profileAllith is about 1.2 km from the sea coast (OpenStreetMap)© OpenStreetMap contributors (ODbL)
District profileThe centre of Allith sits about 5 m above sea level (SRTM open elevation data)SRTM (NASA) open data
RoadsMain roads in or near Allith: Al Laith Road, Amr Bin Al Aas StreetKashf data (owner)
Bathroom waterproofing (per m²)SAR 15–40 per m²Owner price list (Allith)

Short answers for Allith

Where does floor & balcony waterproofing (before summer & rain season) start in Allith?

We start with checking the falls (where water collects and where it should go), then details (thresholds, drains and upstands).

What does floor & balcony waterproofing cost in Allith?

From our published price list: Bathroom waterproofing (per m²) SAR 15–40 per m². Quantities are confirmed at the inspection.

What do I receive after the work?

The flood result and photos of the details, in a technical report that carries a verification code.

What we advise against

What you receive

You receive: the flood result and photos of the details, in a technical report with a verification code.

Practical notes for residents of Allith

  • Have access ready to the water meter, the tank hatches, the roof and the main valve; in apartment buildings the roof keys are often with the building guard (haris).
  • Prices are in Saudi riyals (SAR); the final price is confirmed after the inspection, before any work starts.
  • Keep photos of the problem and of any earlier repairs — they help the technician compare before and after.
  • If you rent, tell your landlord or building management before the visit and agree in writing who pays; the written report can be shared with them.