Home About Us Services Guide Emergency Service Our Services Documented Report Tools Hub Glossary Blog Service Cities FAQ Pest Control Contact Us
Book onlineTracking number at once · no holdCall nowWater leak emergencyWhatsAppMessage us

Floor & balcony waterproofing for villas in Alrass

Prepared by the technical team · editorial review · last updated 13 November 2026 · Sources

In short: In Alrass (Alrass), floor & balcony waterproofing for villas begins with the roof, falls and drains survey and the moisture meter for ceilings and walls; nothing is opened until the position is clear. The centre of Alrass sits about 695 m above sea level (SRTM open elevation data). Pricing starts from Bathroom waterproofing (per m²) (SAR 15–40 per m²), and other items are quoted after the visit.

Floor & balcony waterproofing in Alrass: the local context

The centre of Alrass sits about 695 m above sea level (SRTM open elevation data). Main roads in or near Alrass: King Abdulaziz Road, King Fahd Road, King Salman Road.

Team note on Alrass: Kashf teams serve this city and its nearby districts with the same documented inspection standard: device-based leak detection without demolition, a written report, and a clear scope before any work begins..

Before any material is chosen for a villa floor or balcony in Alrass, the technician first checks the ground and the exposure. The centre of Alrass sits about 695 m above sea level (SRTM open elevation data), so the site is inland and well above the coast, which shapes how water moves across a slab and how sun and temperature swing across the day. The first checks are therefore the slope of the floor towards its drains, the condition of existing screeds and tiles, and any hairline cracks that could let water reach the structure. Where a crack is found, crack injection is priced at SAR 40–120 per metre, and that figure helps the homeowner understand the scale of the work before the visit is complete.

Several matters are left to the site visit itself. The exact choice between liquid roof waterproofing at SAR 8–25 per m², bitumen membrane at SAR 15–35 per m², or XPS boards at SAR 12–30 per m² depends on whether the surface is a roof terrace, an open balcony or a covered floor. Likewise, whether a bathroom area needs bathroom waterproofing at SAR 15–40 per m² or an epoxy coating at SAR 35–90 per m² is decided on the spot, as is whether spray foam at SAR 20–45 per m² suits the substrate. Basement waterproofing, priced at SAR 50–150 per m², and tank internal coating, at SAR 25–60 per m², are assessed only when those areas are part of the job. The technician should also note existing drainage outlets, upstands at door thresholds and any tiling that must be lifted.

To help the technician, the homeowner should prepare a clear note of the areas to be treated, their approximate dimensions in square metres and any linear lengths of cracks, so the scope can be matched to the rates above. It helps to mention whether the balcony is exposed to direct sun, whether the floor has been waterproofed before, and when leaks were last noticed and where. Access to the roof or balcony, the position of water tanks and any electrical fittings near the work should also be shown. Clear answers to these points let the technician move straight to the right method and give an accurate estimate.

Service-area map for waterproofing & insulation in AlrassAlrass2 kmNSchematic · coordinates from Kashf data
The approximate extent of Alrass — the exact location of your job is set when you book.

In a villa, tanks, the roof and the yard lines are usually yours to look after, so it helps to know where the main valve and tank hatches are.

Signs that call for floor & balcony waterproofing

The following signs are worth checking before they grow:

The most common causes

How we choose the tool in Alrass

Tool or methodWhat it measuresWhy it is chosen here
Flood testWhether the waterproofing holds before it is coveredLimits: for roofs with drains and wet areas before tiling
Roof, falls and drains surveyPonding areas and the condition of the old layerLimits: shows the condition, not the material alone
Moisture meter for ceilings and wallsWhere water is entering now, from insideLimits: measures the effect, not the water path

From the first visit to the report

  1. Checking the falls: Where water collects and where it should go.
  2. Details: Thresholds, drains and upstands.
  3. Waterproofing: The layer is applied and protected.
  4. Flood test: Tested before the finish goes on.

Quick comparison: facts and costs in Alrass

ItemValueSource
RoadsMain roads in or near Alrass: King Abdulaziz Road, King Fahd Road, King Salman RoadKashf data (owner)
District profileThe centre of Alrass sits about 695 m above sea level (SRTM open elevation data)SRTM (NASA) open data
District profileTeam note on Alrass: Kashf teams serve this city and its nearby districts with the same documented inspection standard: device-based leak detection without demolition, a written report, and a clear scope before any work begins.Kashf team
Bathroom waterproofing (per m²)SAR 15–40 per m²Owner price list (Alrass)

Questions from Alrass

What is the first step of floor & balcony waterproofing for villas?

We start with checking the falls (where water collects and where it should go), then details (thresholds, drains and upstands).

How much does floor & balcony waterproofing cost in Alrass?

From our published price list: Bathroom waterproofing (per m²) SAR 15–40 per m². Quantities are confirmed at the inspection.

What do I get at the end?

The flood result and photos of the details, in a technical report that carries a verification code.

Common mistakes we see

What you get after the work

The written output: the flood result and photos of the details. The report is numbered and can be checked with its verification code.

Practical notes for residents of Alrass

  • Prices are in Saudi riyals (SAR); the final price is confirmed after the inspection, before any work starts.
  • Have access ready to the water meter, the tank hatches, the roof and the main valve; in apartment buildings the roof keys are often with the building guard (haris).
  • If you rent, tell your landlord or building management before the visit and agree in writing who pays; the written report can be shared with them.
  • Keep photos of the problem and of any earlier repairs — they help the technician compare before and after.

Sources and method