Home About Us Services Guide Emergency Service Our Services Documented Report Tools Hub Glossary Blog Service Cities FAQ Pest Control Contact Us
Book onlineTracking number at once · no holdCall nowWater leak emergencyWhatsAppMessage us

Roof waterproofing for hotels & serviced apartments in Alrass

Prepared by the technical team · editorial review · last updated 13 November 2026 · Sources

In short: Roof waterproofing for hotels & serviced apartments in Alrass starts with the roof, falls and drains survey, then the moisture meter for ceilings and walls, before anything is opened. The centre of Alrass sits about 695 m above sea level (SRTM open elevation data). Published price: Liquid roof waterproofing (per m²), SAR 8–25 per m²; anything else is quoted after the inspection.

Before we start: what we know about Alrass

Main roads in or near Alrass: King Abdulaziz Road, King Fahd Road, King Salman Road. The centre of Alrass sits about 695 m above sea level (SRTM open elevation data).

Team note on Alrass: Kashf teams serve this city and its nearby districts with the same documented inspection standard: device-based leak detection without demolition, a written report, and a clear scope before any work begins..

Roof waterproofing work for hotels and serviced apartments in Alrass starts with the elevation. The centre of Alrass sits about 695 m above sea level (SRTM open elevation data), so the first things we check are how water drains off the roof and where it would collect during heavy rain. A flat roof that falls toward a single outlet, or a parapet that traps water at its base, tells us a great deal before any product is chosen. We also look at existing upstands, drain outlets and any roof-mounted tanks or plant, because these set the lines along which a membrane must run and seal.

Several points are left to the site visit, because they depend on what is actually on the roof. The technician needs to see the substrate condition, whether it is sound concrete, screed or an old bitumen layer, and whether there are blisters, cracks or ponding that will change the method. The age and type of any existing waterproofing, the number and position of penetrations such as pipes, vents and satellite mounts, and whether the roof is in active use by guests or staff all shape the work. Access routes, the presence of occupied rooms below, and any restrictions on working hours are also confirmed on site rather than assumed from a desk.

To help the technician prepare, it is useful to share the roof's approximate dimensions, the number of floors below, and any previous leak history with dates and locations. Photographs of ceiling stains inside the building, the position of roof drains, and any tank or basement areas that share a wall with the roof area are valuable. Note which systems the property has already used, such as liquid coatings, bitumen membranes or insulation boards, since this affects compatibility. Clear information on when rooms can be closed and who signs off the schedule will let the crew plan materials and access before arriving.

Service-area map for waterproofing & insulation in AlrassAlrass2 kmNSchematic · coordinates from Kashf data
Approximate area of Alrass — a schematic that does not show any customer address.

For hotels and serviced apartments, rooms are handled in batches to keep units available.

Signs worth paying attention to

If you notice one of these signs in Alrass, it is a good moment to talk to the team:

The most common causes

Tools and methods, and when we use them

MethodWhat it helps withIts role in Alrass
Flood testWhether the waterproofing holds before it is coveredLimits: for roofs with drains and wet areas before tiling
Moisture meter for ceilings and wallsWhere water is entering now, from insideLimits: measures the effect, not the water path
Roof, falls and drains surveyPonding areas and the condition of the old layerLimits: shows the condition, not the material alone

How the work is done, step by step

  1. Survey: Falls, drains and the condition of the old layer are recorded.
  2. Preparation: Cleaning and repairs before any new layer.
  3. Primer: The base coat that the system needs.
  4. Waterproofing layers and details: Corners, upstands and bases get their own detail.
  5. Flood test: The roof is flooded and checked before it is covered.

Facts and costs — Alrass

ItemValueSource
District profileThe centre of Alrass sits about 695 m above sea level (SRTM open elevation data)SRTM (NASA) open data
RoadsMain roads in or near Alrass: King Abdulaziz Road, King Fahd Road, King Salman RoadKashf data (owner)
District profileTeam note on Alrass: Kashf teams serve this city and its nearby districts with the same documented inspection standard: device-based leak detection without demolition, a written report, and a clear scope before any work begins.Kashf team
Liquid roof waterproofing (per m²)SAR 8–25 per m²Owner price list (Alrass)
Bitumen membrane (per m²)SAR 15–35 per m²Owner price list (Alrass)

Short answers for Alrass

Where does roof waterproofing for hotels & serviced apartments start in Alrass?

We start with survey (falls, drains and the condition of the old layer are recorded), then preparation (cleaning and repairs before any new layer).

What does roof waterproofing cost in Alrass?

From our published price list: Liquid roof waterproofing (per m²) SAR 8–25 per m²; Bitumen membrane (per m²) SAR 15–35 per m². Quantities are confirmed at the inspection.

What do I receive after the work?

A quality record with photos and the flood-test result, in a technical report that carries a verification code.

Common mistakes we see

What you get after the work

The written output: a quality record with photos and the flood-test result. The report is numbered and can be checked with its verification code.

Planning the visit in Alrass

  • Keep photos of the problem and of any earlier repairs — they help the technician compare before and after.
  • If you rent, tell your landlord or building management before the visit and agree in writing who pays; the written report can be shared with them.
  • Have access ready to the water meter, the tank hatches, the roof and the main valve; in apartment buildings the roof keys are often with the building guard (haris).
  • Prices are in Saudi riyals (SAR); the final price is confirmed after the inspection, before any work starts.

Sources and method