Floor & balcony waterproofing for offices & commercial complexes in Alula
In short: In Alula (Alula), floor & balcony waterproofing for offices & commercial complexes begins with the roof, falls and drains survey and the moisture meter for ceilings and walls; nothing is opened until the position is clear. The centre of Alula sits about 697 m above sea level (SRTM open elevation data). Published price: Bathroom waterproofing (per m²), SAR 15–40 per m²; anything else is quoted after the inspection.
Floor & balcony waterproofing in Alula: the local context
The centre of Alula sits about 697 m above sea level (SRTM open elevation data). Main roads in or near Alula: King Abdullah Road.
Does a leaking office floor or balcony slab always mean a costly rebuild? Usually it does not, and the facts show why. Waterproofing for floors and balconies in commercial buildings is priced by the square metre, with liquid roof waterproofing at SAR 8–25 per m², bitumen membrane at SAR 15–35 per m², and epoxy coating at SAR 35–90 per m². Where a leak is confined to hairline cracks, crack injection is charged per metre at SAR 40–120 per m. Choosing the right system depends on the surface and how it is used, not on a single fixed approach. Projects in Alula, where the centre sits about 697 m above sea level, are assessed on the same basis as anywhere else, with the surface condition deciding the method.
Our inspection begins with a walk over the affected floor or balcony to map where water is entering and where it is pooling. The team checks the slab for cracks, the junctions with walls and drainage outlets, and the condition of any existing coating. Where cracks are active, they are marked and measured so the length can be priced per metre. Areas of wider damage are measured in square metres so the surface can be calculated against the unit rates. The inspection also notes whether the surface sits under a finished floor, a tiled balcony or an exposed roof, because each changes the preparation and the material chosen. At the end of the visit, the findings are set out clearly so you can see which areas need attention and why.
Before the visit, gather a few details that speed up the assessment. Note where the leaks appear, especially after rain, and how long they have been happening. Have the building's drawings or as-built plans available if you hold them, showing slab areas and drainage positions. Clear access to the affected floor or balcony so the surface can be walked and measured without obstruction. If previous repairs or coatings were applied, record the product name or contractor's notes if you have them. Tell us whether the area is in regular use, since this affects when work can be scheduled around tenants and daily operations.
For offices and commercial complexes, work is scheduled to avoid disrupting staff and visitors.
Signs worth paying attention to
If you notice one of these signs in Alula, it is a good moment to talk to the team:
- Damp under the light well
- Water passing from the balcony to the floor below
- A wrong fall towards the door threshold
Causes we see in the field
- A common cause: a blocked drain.
- A threshold without waterproofing.
- A common cause: incorrect falls.
Tools and methods, and when we use them
| Method | What it helps with | Its role in Alula |
|---|---|---|
| Roof, falls and drains survey | Ponding areas and the condition of the old layer | Limits: shows the condition, not the material alone |
| Moisture meter for ceilings and walls | Where water is entering now, from inside | Limits: measures the effect, not the water path |
| Flood test | Whether the waterproofing holds before it is covered | Limits: for roofs with drains and wet areas before tiling |
How the work is done, step by step
- Checking the falls: Where water collects and where it should go.
- Details: Thresholds, drains and upstands.
- Waterproofing: The layer is applied and protected.
- Flood test: Tested before the finish goes on.
Quick comparison: facts and costs in Alula
| Item | Value | Source |
|---|---|---|
| Roads | Main roads in or near Alula: King Abdullah Road | Kashf data (owner) |
| District profile | The centre of Alula sits about 697 m above sea level (SRTM open elevation data) | SRTM (NASA) open data |
| Bathroom waterproofing (per m²) | SAR 15–40 per m² | Owner price list (Alula) |
Questions from Alula
What is the first step of floor & balcony waterproofing for offices & commercial complexes?
We start with checking the falls (where water collects and where it should go), then details (thresholds, drains and upstands).
How much does floor & balcony waterproofing cost in Alula?
From our published price list: Bathroom waterproofing (per m²) SAR 15–40 per m². Quantities are confirmed at the inspection.
What do I get at the end?
The flood result and photos of the details, in a technical report that carries a verification code.
Common mistakes we see
- Tiling a balcony without waterproofing
What you get after the work
The written output: the flood result and photos of the details. The report is numbered and can be checked with its verification code.
Planning the visit in Alula
- You can message us on WhatsApp in English; the booking details are sent back to you in the chat to confirm before the visit.
- The Saudi weekend is Friday and Saturday; mention your preferred day and time when booking.
- Have access ready to the water meter, the tank hatches, the roof and the main valve; in apartment buildings the roof keys are often with the building guard (haris).
- Prices are in Saudi riyals (SAR); the final price is confirmed after the inspection, before any work starts.
Sources and method
- SRTM (NASA) open data
- Kashf data (owner)
- Owner price list for Alula
- Local pages are published only after a quality gate: real local facts, text similarity of no more than 15% with any other English page, and a claims check.
- النسخة العربية