Floor & balcony waterproofing in Baqiq: before summer & rain season
الخلاصة: In short: In Baqiq (Baqiq), floor & balcony waterproofing (before summer & rain season) begins with the roof, falls and drains survey and the moisture meter for ceilings and walls; nothing is opened until the position is clear. The centre of Baqiq sits about 83 m above sea level (SRTM open elevation data).
Before we start: what we know about Baqiq
Team note on Baqiq: Kashf teams serve this city and its nearby districts with the same documented inspection standard: device-based leak detection without demolition, a written report, and a clear scope before any work begins.. Main roads in or near Baqiq: King Fahd Road.
The centre of Baqiq sits about 83 m above sea level (SRTM open elevation data).
Before any work starts on a floor or balcony in Baqiq, the technician first checks how water will reach the surface. The centre of Baqiq sits about 83 m above sea level, which is a useful reminder that the area is not a low-lying basin where water collects naturally, so the first questions concern drainage falls, the slope of the floor towards outlets, and whether rainwater runs off the balcony edge or pools against the wall. Cracks are the next thing to look at, because a hairline crack that is ignored in dry weather can carry water through in a storm. Where cracks are found, crack injection is typically priced at SAR 40–120 per metre, so the length of each crack is measured early so the scope and cost are clear before any material is chosen.
The detailed decisions are left to the site visit, where the technician can see the substrate and the condition of the existing layers. Whether the surface needs liquid waterproofing, a bitumen membrane, or a coating system depends on what is already there and how it has behaved. Liquid roof waterproofing usually falls within SAR 8–25 per m², bitumen membrane within SAR 15–35 per m², and epoxy coating within SAR 35–90 per m², but the right choice is decided on the spot rather than from a list. The technician also checks whether bathrooms adjoining the balcony need separate work, since bathroom waterproofing is priced at SAR 15–40 per m² and is handled as its own area. Where insulation is needed under a finish, XPS boards at SAR 12–30 per m² may be considered after the surface has been inspected.
To help the technician prepare, it is useful to have the following ready before the visit: a rough sketch of the floor or balcony with its dimensions, the location of drainage outlets and any visible cracks, and a note of when leaks were last seen and whether they appeared during rain or after cleaning. Access to the area should be clear, and any furniture or planters should be moved if possible. Tell the technician if the balcony is used for water storage or sits above a habitable room, as this affects the materials considered. Clear information at this stage shortens the visit and makes the final scope easier to agree.
Checks before summer and before the rain season catch problems while they are still small.
Signs worth paying attention to
These are the signs most often linked to floor & balcony waterproofing:
- Damp under the light well
- A wrong fall towards the door threshold
- Water passing from the balcony to the floor below
Causes we see in the field
- A blocked drain.
- A common cause: incorrect falls.
- A common cause: a threshold without waterproofing.
How we choose the tool in Baqiq
| Tool | What it finds | When we use it in Baqiq |
|---|---|---|
| Moisture meter for ceilings and walls | Where water is entering now, from inside | Limits: measures the effect, not the water path |
| Roof, falls and drains survey | Ponding areas and the condition of the old layer | Limits: shows the condition, not the material alone |
| Flood test | Whether the waterproofing holds before it is covered | Limits: for roofs with drains and wet areas before tiling |
From the first visit to the report
- Checking the falls: Where water collects and where it should go.
- Details: Thresholds, drains and upstands.
- Waterproofing: The layer is applied and protected.
- Flood test: Tested before the finish goes on.
Baqiq in facts and sources
| Item | Value | Source |
|---|---|---|
| District profile | Team note on Baqiq: Kashf teams serve this city and its nearby districts with the same documented inspection standard: device-based leak detection without demolition, a written report, and a clear scope before any work begins. | Kashf team |
| District profile | The centre of Baqiq sits about 83 m above sea level (SRTM open elevation data) | SRTM (NASA) open data |
| Roads | Main roads in or near Baqiq: King Fahd Road | Kashf data (owner) |
| Bathroom waterproofing (per m²) | SAR 15–40 per m² | Owner price list (Baqiq) |
Questions from Baqiq
What is the first step of floor & balcony waterproofing (before summer & rain season)?
We start with checking the falls (where water collects and where it should go), then details (thresholds, drains and upstands).
How much does floor & balcony waterproofing cost in Baqiq?
From our published price list: Bathroom waterproofing (per m²) SAR 15–40 per m². Quantities are confirmed at the inspection.
What do I get at the end?
The flood result and photos of the details, in a technical report that carries a verification code.
What we advise against
- Tiling a balcony without waterproofing
What you get after the work
The written output: the flood result and photos of the details. The report is numbered and can be checked with its verification code.
Practical notes for residents of Baqiq
- The Saudi weekend is Friday and Saturday; mention your preferred day and time when booking.
- You can message us on WhatsApp in English; the booking details are sent back to you in the chat to confirm before the visit.
- Keep photos of the problem and of any earlier repairs — they help the technician compare before and after.
- If you rent, tell your landlord or building management before the visit and agree in writing who pays; the written report can be shared with them.
Sources and method
- SRTM (NASA) open data
- Kashf data (owner)
- Kashf team
- Owner price list for Baqiq
- Local pages are published only after a quality gate: real local facts, text similarity of no more than 15% with any other English page, and a claims check.
- النسخة العربية