Home About Us Services Guide Emergency Service Our Services Documented Report Tools Hub Glossary Blog Service Cities FAQ Pest Control Contact Us
Book onlineTracking number at once · no holdCall nowWater leak emergencyWhatsAppMessage us

Floor & balcony waterproofing in Jeddah: with a verifiable technical report

Prepared by the technical team · editorial review · last updated 13 November 2026 · Sources

In short: Floor & balcony waterproofing (with a verifiable technical report) in Jeddah starts with the roof, falls and drains survey, then the moisture meter for ceilings and walls, before anything is opened. Jeddah is about 2 km from the sea coast (OpenStreetMap). Pricing starts from Bathroom waterproofing (per m²) (SAR 15–40 per m²), and other items are quoted after the visit.

What is specific about Jeddah for floor & balcony waterproofing

Team note on Jeddah: Kashf teams serve this city and its nearby districts with the same documented inspection standard: device-based leak detection without demolition, a written report, and a clear scope before any work begins.. Jeddah is about 2 km from the sea coast (OpenStreetMap).

The centre of Jeddah sits about 15 m above sea level (SRTM open elevation data).

Floor and balcony waterproofing in Jeddah starts with the location itself. The centre of Jeddah sits about 15 m above sea level (SRTM open elevation data), and the city is about 2 km from the sea coast (OpenStreetMap). Because the coast is close, the technician checks first how water moves across and through the slab, and whether rainwater or groundwater is likely to collect at low points. Balconies and external floors are reviewed for drainage falls, outlet positions, and any existing upstands, since these decide whether water runs away from the building or pools against the wall.

Some points can only be settled during the site visit. The technician walks the surface to find cracks, blistered finishes, failed old membranes, and areas where ponding has already occurred. Crack lines are measured in metres so the work can be priced properly, and the choice between injection, spray foam, epoxy coating, or a membrane depends on what is actually found. Where a balcony meets a wall or door threshold, the junction is inspected in person. Access routes, the condition of the substrate, and whether the surface is still damp are also judged on the spot, because these affect the method and the working time.

To help the technician prepare, residents and property managers should note the areas that leak or stay wet after rain, the age of any previous waterproofing, and whether the floor sits above a bathroom, a basement, or an occupied room below. Photographs of stains, cracks, and drainage outlets are useful, as are details of any furniture or fixtures that will need moving. Pricing references for the main methods are listed for planning: spray foam runs SAR 20–45 per m², epoxy coating SAR 35–95 per m², crack injection SAR 40–125 per metre, bitumen membrane SAR 15–35 per m², and liquid roof waterproofing SAR 10–25 per m². Final quotes are issued only after the site visit confirms which method suits the floor or balcony in question.

Service-area map for waterproofing & insulation in JeddahJeddah2 kmNSchematic · coordinates from Kashf data
The approximate extent of Jeddah — the exact location of your job is set when you book.

Each job ends with a written report that carries a verification code you can check on our site.

Signs worth paying attention to

If you notice one of these signs in Jeddah, it is a good moment to talk to the team:

Where the problem usually comes from

Tools we use in Jeddah

Tool or methodWhat it measuresWhy it is chosen here
Moisture meter for ceilings and wallsWhere water is entering now, from insideLimits: measures the effect, not the water path
Roof, falls and drains surveyPonding areas and the condition of the old layerLimits: shows the condition, not the material alone
Flood testWhether the waterproofing holds before it is coveredLimits: for roofs with drains and wet areas before tiling

From the first visit to the report

  1. Checking the falls: Where water collects and where it should go.
  2. Details: Thresholds, drains and upstands.
  3. Waterproofing: The layer is applied and protected.
  4. Flood test: Tested before the finish goes on.

Jeddah in facts and sources

ItemValueSource
District profileTeam note on Jeddah: Kashf teams serve this city and its nearby districts with the same documented inspection standard: device-based leak detection without demolition, a written report, and a clear scope before any work begins.Kashf team
District profileThe centre of Jeddah sits about 15 m above sea level (SRTM open elevation data)SRTM (NASA) open data
District profileJeddah is about 2 km from the sea coast (OpenStreetMap)© OpenStreetMap contributors (ODbL)
Bathroom waterproofing (per m²)SAR 15–40 per m²Owner price list (Jeddah)

Short answers for Jeddah

Can I use household chemicals instead of calling a technician?

Using unsuitable chemicals may corrode pipes and does not fix the root cause of the blockage, so it is better to rely on a specialist technician.

What is the difference between foam insulation and other types of insulation?

Foam insulation is easy to apply on uneven surfaces and forms one continuous layer with no joints, while other types, such as bitumen rolls, need the joints to be welded. The contractor decides which is most suitable after inspecting the site.

Can thermal insulation be applied to an existing building?

Yes, thermal insulation can be installed on the roofs and walls of existing buildings without the need for major structural modifications. The contractor prepares the surface, then applies the insulating material and the protective layer over it.

Where does floor & balcony waterproofing (with a verifiable technical report) start in Jeddah?

We start with checking the falls (where water collects and where it should go), then details (thresholds, drains and upstands).

What does floor & balcony waterproofing cost in Jeddah?

From our published price list: Bathroom waterproofing (per m²) SAR 15–40 per m². Quantities are confirmed at the inspection.

What do I receive after the work?

The flood result and photos of the details, in a technical report that carries a verification code.

Common mistakes we see

What you get after the work

The written output: the flood result and photos of the details. The report is numbered and can be checked with its verification code.

Practical notes for residents of Jeddah

  • The Saudi weekend is Friday and Saturday; mention your preferred day and time when booking.
  • You can message us on WhatsApp in English; the booking details are sent back to you in the chat to confirm before the visit.
  • If you rent, tell your landlord or building management before the visit and agree in writing who pays; the written report can be shared with them.
  • Keep photos of the problem and of any earlier repairs — they help the technician compare before and after.

Sources and method