Home About Us Services Guide Emergency Service Our Services Documented Report Tools Hub Glossary Blog Service Cities FAQ Pest Control Contact Us
Book onlineTracking number at once · no holdCall nowWater leak emergencyWhatsAppMessage us

Floor & balcony waterproofing for apartments in Jubail

Prepared by the technical team · editorial review · last updated 13 November 2026 · Sources

In short: Floor & balcony waterproofing for apartments in Jubail starts with the roof, falls and drains survey, then the moisture meter for ceilings and walls, before anything is opened. The centre of Jubail sits about 4 m above sea level (SRTM open elevation data). Published price: Bathroom waterproofing (per m²), SAR 15–40 per m²; anything else is quoted after the inspection.

What is specific about Jubail for floor & balcony waterproofing

Team note on Jubail: Kashf teams serve this city and its nearby districts with the same documented inspection standard: device-based leak detection without demolition, a written report, and a clear scope before any work begins.. The centre of Jubail sits about 4 m above sea level (SRTM open elevation data).

Jubail is about 0.9 km from the sea coast (OpenStreetMap).

Before any material is chosen for a floor or balcony in Jubail, the first check is how close the building sits to the water. The centre of Jubail sits about 4 m above sea level, and the town is about 0.9 km from the sea coast. Both facts matter because salt-laden air and a high water table can speed up the breakdown of surface coatings and make moisture harder to shed from a slab. For that reason the technician looks first at the slab edges, drainage outlets, and any spot where water already sits or stains the finish, since these show how the sea-side conditions are reaching this particular unit.

Other points are left to the site visit, because they depend on what is physically in front of the technician. Whether a balcony has cracks that need injecting, how far the existing finish has lifted, the condition of the falls toward the drain, and whether the floor is over an occupied space below all have to be seen in person. The technician also checks whether a bathroom or wet area adjoins the balcony, since water from one can reach the other. Prices for work such as crack injection, which is quoted at SAR 40–120 per metre, or liquid roof waterproofing at SAR 8–25 per m², depend on measured quantities, so no firm figure is set until the area and defects have been recorded on site.

To help the technician arrive prepared, residents are asked to share a few details in advance. Note the approximate floor area of the balcony or terrace, the floor level of the apartment, and whether the surface has been coated before and when. Mention any staining, blistering, or cracks you have noticed, and whether water collects after rain. Tell the team if the balcony is partly covered, or if it is used for washing or as a garden, because foot traffic and standing water both affect the choice of system. Clear access to the balcony and to the flat below, where the ceiling might show damp, will let the visit cover everything in one session.

Service-area map for waterproofing & insulation in JubailJubail2 kmNSchematic · coordinates from Kashf data
Approximate area of Jubail — a schematic that does not show any customer address.

In apartment buildings, the floor below is often where a leak shows first.

When do you need floor & balcony waterproofing?

The following signs are worth checking before they grow:

Causes we see in the field

Tools we use in Jubail

Tool or methodWhat it measuresWhy it is chosen here
Roof, falls and drains surveyPonding areas and the condition of the old layerLimits: shows the condition, not the material alone
Moisture meter for ceilings and wallsWhere water is entering now, from insideLimits: measures the effect, not the water path
Flood testWhether the waterproofing holds before it is coveredLimits: for roofs with drains and wet areas before tiling

From the first visit to the report

  1. Checking the falls: Where water collects and where it should go.
  2. Details: Thresholds, drains and upstands.
  3. Waterproofing: The layer is applied and protected.
  4. Flood test: Tested before the finish goes on.

Facts and costs — Jubail

ItemValueSource
District profileTeam note on Jubail: Kashf teams serve this city and its nearby districts with the same documented inspection standard: device-based leak detection without demolition, a written report, and a clear scope before any work begins.Kashf team
District profileJubail is about 0.9 km from the sea coast (OpenStreetMap)© OpenStreetMap contributors (ODbL)
District profileThe centre of Jubail sits about 4 m above sea level (SRTM open elevation data)SRTM (NASA) open data
Bathroom waterproofing (per m²)SAR 15–40 per m²Owner price list (Jubail)

Common questions about floor & balcony waterproofing in Jubail

Where does floor & balcony waterproofing for apartments start in Jubail?

We start with checking the falls (where water collects and where it should go), then details (thresholds, drains and upstands).

What does floor & balcony waterproofing cost in Jubail?

From our published price list: Bathroom waterproofing (per m²) SAR 15–40 per m². Quantities are confirmed at the inspection.

What do I receive after the work?

The flood result and photos of the details, in a technical report that carries a verification code.

Mistakes that cost more

What you get after the work

The written output: the flood result and photos of the details. The report is numbered and can be checked with its verification code.

Planning the visit in Jubail

  • You can message us on WhatsApp in English; the booking details are sent back to you in the chat to confirm before the visit.
  • The Saudi weekend is Friday and Saturday; mention your preferred day and time when booking.
  • Have access ready to the water meter, the tank hatches, the roof and the main valve; in apartment buildings the roof keys are often with the building guard (haris).
  • Prices are in Saudi riyals (SAR); the final price is confirmed after the inspection, before any work starts.

Sources and method