Floor & balcony waterproofing in Madinah: before buying or handover
In short: In Madinah (Madinah), floor & balcony waterproofing (before buying or handover) begins with the roof, falls and drains survey and the moisture meter for ceilings and walls; nothing is opened until the position is clear. The centre of Madinah sits about 589 m above sea level (SRTM open elevation data). Published price: Bathroom waterproofing (per m²), SAR 15–40 per m²; anything else is quoted after the inspection.
Before we start: what we know about Madinah
The centre of Madinah sits about 589 m above sea level (SRTM open elevation data). Team note on Madinah: Kashf teams serve this city and its nearby districts with the same documented inspection standard: device-based leak detection without demolition, a written report, and a clear scope before any work begins..
Before you buy floor or balcony waterproofing in Madinah, a technician will first look at the ground and the surface you want to protect, because the local setting shapes which system makes sense. The centre of Madinah sits about 589 m above sea level, which means the site is well inland and far from the coast, so a sea-spray check is not the first priority. Instead, start by confirming the exact surface type, whether it is a concrete slab, a tiled balcony, or a bathroom floor, and note any existing cracks or ponding areas. Pricing is also worth understanding early: bathroom waterproofing runs SAR 15–40 per m², balcony liquid roof systems SAR 10–25 per m², and crack injection SAR 40–120 per metre, so measuring the area and the length of cracks beforehand helps you compare quotes fairly.
Several things can only be judged on the day of the site visit. The technician should walk the balcony and floor, check how water drains toward outlets, and decide whether a membrane, an epoxy coating, or spray foam suits the surface, with epoxy coating at SAR 35–90 per m² and spray foam at SAR 20–45 per m² being common options to weigh. The condition of the existing substrate, the slope for drainage, and whether tiles must be lifted are all judgements that depend on what is actually there. If the balcony has a finished surface you want to keep, the technician will also say whether it can be protected during work. These points cannot be settled from a phone call or a photo, so treat the site visit as the stage where the final method and cost are confirmed.
To help the technician prepare, have a short list ready: the approximate size of each floor or balcony area, a note of where leaks or damp patches have appeared, and any past repairs you know about. Mention whether the area is a bathroom, a balcony, or a roof-level surface, since bitumen membrane (SAR 15–35 per m²) and XPS boards (SAR 10–30 per m²) suit different situations. Share access details and the times you are available, and point out any water tanks or basement areas nearby. Clear information at this stage lets the technician arrive ready to inspect properly, which shortens the visit and makes the quote easier to understand.
Before buying or taking over a property, an inspection gives you findings in writing before you sign.
When do you need floor & balcony waterproofing?
These are the signs most often linked to floor & balcony waterproofing:
- Damp under the light well
- Water passing from the balcony to the floor below
- A wrong fall towards the door threshold
The most common causes
- A common cause: a blocked drain.
- A threshold without waterproofing — we check this before anything else.
- Incorrect falls — we check this before anything else.
How we choose the tool in Madinah
| Tool | What it finds | When we use it in Madinah |
|---|---|---|
| Roof, falls and drains survey | Ponding areas and the condition of the old layer | Limits: shows the condition, not the material alone |
| Moisture meter for ceilings and walls | Where water is entering now, from inside | Limits: measures the effect, not the water path |
| Flood test | Whether the waterproofing holds before it is covered | Limits: for roofs with drains and wet areas before tiling |
From the first visit to the report
- Checking the falls: Where water collects and where it should go.
- Details: Thresholds, drains and upstands.
- Waterproofing: The layer is applied and protected.
- Flood test: Tested before the finish goes on.
Madinah in facts and sources
| Item | Value | Source |
|---|---|---|
| District profile | Team note on Madinah: Kashf teams serve this city and its nearby districts with the same documented inspection standard: device-based leak detection without demolition, a written report, and a clear scope before any work begins. | Kashf team |
| District profile | The centre of Madinah sits about 589 m above sea level (SRTM open elevation data) | SRTM (NASA) open data |
| Bathroom waterproofing (per m²) | SAR 15–40 per m² | Owner price list (Madinah) |
Common questions about floor & balcony waterproofing in Madinah
What is the difference between standard spraying and integrated pest management?
Standard spraying treats visible symptoms only, while integrated pest management includes diagnosis, sealing entry points, and multiple methods for longer-lasting results.
Could the leak be caused by weak waterproofing rather than the pipes?
Yes, damage to the waterproofing layer beneath the bathroom floor is one of the most common causes of leaks, especially in older buildings. In this case, water seeps through the tile joints into the screed and then down to the ceiling below. A specialized inspection can distinguish this from a pipe leak.
What is the difference between drain unblocking and drain cleaning?
Unblocking removes an existing blockage that prevents drainage, while cleaning is a preventive procedure that removes deposits and grease from pipes before they cause a blockage.
What is the first step of floor & balcony waterproofing (before buying or handover)?
We start with checking the falls (where water collects and where it should go), then details (thresholds, drains and upstands).
How much does floor & balcony waterproofing cost in Madinah?
From our published price list: Bathroom waterproofing (per m²) SAR 15–40 per m². Quantities are confirmed at the inspection.
What do I get at the end?
The flood result and photos of the details, in a technical report that carries a verification code.
What we advise against
- Tiling a balcony without waterproofing
The written outputs
The written output: the flood result and photos of the details. The report is numbered and can be checked with its verification code.
Planning the visit in Madinah
- You can message us on WhatsApp in English; the booking details are sent back to you in the chat to confirm before the visit.
- The Saudi weekend is Friday and Saturday; mention your preferred day and time when booking.
- Prices are in Saudi riyals (SAR); the final price is confirmed after the inspection, before any work starts.
- Have access ready to the water meter, the tank hatches, the roof and the main valve; in apartment buildings the roof keys are often with the building guard (haris).
Sources and method
- SRTM (NASA) open data
- Kashf team
- Customer questions (reviewed)
- Owner price list for Madinah
- Local pages are published only after a quality gate: real local facts, text similarity of no more than 15% with any other English page, and a claims check.
- النسخة العربية