Home About Us Services Guide Emergency Service Our Services Documented Report Tools Hub Glossary Blog Service Cities FAQ Pest Control Contact Us
Book onlineTracking number at once · no holdCall nowWater leak emergencyWhatsAppMessage us

Bathroom waterproofing in Makkah: for companies (annual contract)

Prepared by the technical team · editorial review · last updated 13 November 2026 · Sources

In short: Bathroom waterproofing (for companies (annual contract)) in Makkah starts with the moisture meter for ceilings and walls, then the flood test, before anything is opened. The centre of Makkah sits about 301 m above sea level (SRTM open elevation data). Published price: Bathroom waterproofing (per m²), SAR 15–40 per m²; anything else is quoted after the inspection.

Before we start: what we know about Makkah

The centre of Makkah sits about 301 m above sea level (SRTM open elevation data). Team note on Makkah: Kashf teams serve this city and its nearby districts with the same documented inspection standard: device-based leak detection without demolition, a written report, and a clear scope before any work begins..

The centre of Makkah sits about 301 m above sea level, according to SRTM open elevation data. In practical terms, this is a city built in a valley surrounded by hills and rocky ground, where rainfall tends to run off quickly and can pool around low-lying buildings. For companies that manage residential blocks, hotels and staff accommodation, this elevation means that drainage and wall moisture need careful planning before any waterproofing work starts. Bathrooms in lower-floor units and shared wet areas are often the first to show seepage, so the survey stage matters.

Each fact shapes how the service is scoped. Bathroom waterproofing is priced at SAR 15–40 per m², and spray foam at SAR 20–45 per m², so a contract can be sized by the number of wet areas rather than by a single flat rate. Epoxy coating, at SAR 35–95 per m², suits surfaces that will see heavy daily cleaning, while bitumen membrane, at SAR 15–35 per m², is a common choice for areas that must hold back standing water. Crack injection is billed per metre at SAR 40–125 per m, so the length of visible cracks recorded during inspection becomes the basis for an accurate quote. Tank internal coating at SAR 25–65 per m² and XPS boards at SAR 15–30 per m² give managers further options for water storage and insulated walls. Liquid roof waterproofing, at SAR 10–25 per m², helps keep roof areas dry across the rainy months.

Owners who manage several properties usually avoid the same handful of errors. They do not skip the inspection and rely on a single rate for every surface, because a bathroom floor, a wall and a tank each need a different system. They do not leave cracks unsealed while coating the surface around them, since water will find the gap. They also avoid signing off work before the coating has fully cured and tested dry, and they do not treat an annual contract as a one-time job. Setting a yearly review of all wet areas, with a clear record of which surfaces were treated and when, keeps the property protected and the costs predictable.

Service-area map for waterproofing & insulation in MakkahMakkah2 kmNSchematic · coordinates from Kashf data
Approximate area of Makkah — a schematic that does not show any customer address.

For companies, an annual contract sets the scope, the visit schedule and the reports in writing.

When do you need bathroom waterproofing?

These are the signs most often linked to bathroom waterproofing:

The most common causes

Tools and methods, and when we use them

MethodWhat it helps withIts role in Makkah
Moisture meter for ceilings and wallsWhere water is entering now, from insideLimits: measures the effect, not the water path
Flood testWhether the waterproofing holds before it is coveredLimits: for roofs with drains and wet areas before tiling

How the work is done, step by step

  1. Finding the source: A supply-pipe leak is ruled out first.
  2. Preparation: The floor is opened and cleaned where needed.
  3. Corners and details: Tape and detailing at corners, drains and pipe entries.
  4. Flood test: The floor is tested before tiling.

Quick comparison: facts and costs in Makkah

ItemValueSource
District profileTeam note on Makkah: Kashf teams serve this city and its nearby districts with the same documented inspection standard: device-based leak detection without demolition, a written report, and a clear scope before any work begins.Kashf team
District profileThe centre of Makkah sits about 301 m above sea level (SRTM open elevation data)SRTM (NASA) open data
Bathroom waterproofing (per m²)SAR 15–40 per m²Owner price list (Makkah)

Common questions about bathroom waterproofing in Makkah

What does finishing work typically include?

It covers plastering, painting, flooring, stone or marble walls, ceilings, gypsum, doors, windows, and final electrical and plumbing installations. You can request full or partial finishing, with the scope clearly defined in the price quote.

Is it possible to renovate the building without evacuating the residents?

In many cases it can be carried out in phases without a full evacuation if the damage is limited. However, for extensive structural renovation, a temporary evacuation may be recommended to ensure safety, and the contractor will explain this in their proposal.

Does waterproofing require removing existing tiles?

It depends on the site condition. Sometimes surface waterproofing can be applied over tiles, while deep leaks require tile removal to treat the layer underneath. A technician will determine the best option after inspection.

Where does bathroom waterproofing (for companies (annual contract)) start in Makkah?

We start with finding the source (a supply-pipe leak is ruled out first), then preparation (the floor is opened and cleaned where needed).

What does bathroom waterproofing cost in Makkah?

From our published price list: Bathroom waterproofing (per m²) SAR 15–40 per m². Quantities are confirmed at the inspection.

What do I receive after the work?

The flood-test result and photos of each stage, in a technical report that carries a verification code.

Mistakes that cost more

What you receive

The written output: the flood-test result and photos of each stage. The report is numbered and can be checked with its verification code.

If you live in Makkah and are new to the area

  • Have access ready to the water meter, the tank hatches, the roof and the main valve; in apartment buildings the roof keys are often with the building guard (haris).
  • Prices are in Saudi riyals (SAR); the final price is confirmed after the inspection, before any work starts.
  • Keep photos of the problem and of any earlier repairs — they help the technician compare before and after.
  • If you rent, tell your landlord or building management before the visit and agree in writing who pays; the written report can be shared with them.

Sources and method

  • SRTM (NASA) open data
  • Kashf team
  • Customer questions (reviewed)
  • Owner price list for Makkah
  • Local pages are published only after a quality gate: real local facts, text similarity of no more than 15% with any other English page, and a claims check.
  • النسخة العربية