Epoxy coating & waterproofing for apartments in Makkah
In short: Epoxy coating & waterproofing for apartments in Makkah starts with the moisture meter for ceilings and walls, then the thickness measurement at spread-out points, before anything is opened. The centre of Makkah sits about 301 m above sea level (SRTM open elevation data). Pricing starts from Epoxy coating (per m²) (SAR 35–95 per m²), and other items are quoted after the visit.
Why epoxy coating & waterproofing differs in Makkah
The centre of Makkah sits about 301 m above sea level (SRTM open elevation data). Team note on Makkah: Kashf teams serve this city and its nearby districts with the same documented inspection standard: device-based leak detection without demolition, a written report, and a clear scope before any work begins..
Makkah's apartment buildings are dense, high-use structures where many families share stairwells, rooftops and utility spaces, and in several of them repairs are carried out while residents keep living on site. Because of that, a coating job here is usually planned around daily movement, with work phases scheduled so that bathrooms and balconies are not left unusable for long stretches. Whether the building can be repaired without evacuating residents is a question to settle before any materials are ordered, since it changes the sequence of work, the dust control and the access routes.
For an epoxy and waterproofing job in an apartment, the first thing checked is whether the existing tile must be broken out to reach the substrate. Lifting tile adds disturbance and cost, so the team tests whether the membrane can be applied over the current surface after cleaning and profiling. Wet areas such as bathroom floors and balconies are inspected for slope and drainage before any product is chosen, because water that stands after coating is the most common cause of early failure. Basement walls, where present, are assessed separately since they face moisture pressure from outside.
Before the visit, the customer should clear the areas to be treated, note any leaks, cracks or damp patches with photos, and confirm the tile type and whether it was laid recently. It helps to ask the team which parts of the work are finished in one day, how long bathrooms stay out of use, which surfaces get a protective reflective topcoat, and what the cleaning and curing steps involve before normal use resumes.
In apartment buildings, the floor below is often where a leak shows first.
Signs that call for epoxy coating & waterproofing
The following signs are worth checking before they grow:
- Oil stains on a floor
- A tank that needs an easy-to-clean surface
- A warehouse floor that is wearing away
The most common causes
- Insufficient preparation.
- A damp surface that ruins adhesion.
Tools and methods, and when we use them
| Tool or method | What it measures | Why it is chosen here |
|---|---|---|
| Moisture meter for ceilings and walls | Where water is entering now, from inside | Limits: measures the effect, not the water path |
| Thickness measurement at spread-out points | Whether the thickness in the quote was achieved | Limits: for foam and liquid-applied layers |
| Fill test with level monitoring | Whether a tank coating holds after the work | Limits: takes time to monitor the level |
From the first visit to the report
- Surface moisture reading: Epoxy is applied only when the substrate is dry enough.
- Careful preparation: Grinding and cleaning for adhesion.
- Layers: Primer and body coats as specified.
- Inspection: Thickness and curing are checked.
Quick comparison: facts and costs in Makkah
| Item | Value | Source |
|---|---|---|
| District profile | Team note on Makkah: Kashf teams serve this city and its nearby districts with the same documented inspection standard: device-based leak detection without demolition, a written report, and a clear scope before any work begins. | Kashf team |
| District profile | The centre of Makkah sits about 301 m above sea level (SRTM open elevation data) | SRTM (NASA) open data |
| Epoxy coating (per m²) | SAR 35–95 per m² | Owner price list (Makkah) |
Short answers for Makkah
What does finishing work typically include?
It covers plastering, painting, flooring, stone or marble walls, ceilings, gypsum, doors, windows, and final electrical and plumbing installations. You can request full or partial finishing, with the scope clearly defined in the price quote.
Is it possible to renovate the building without evacuating the residents?
In many cases it can be carried out in phases without a full evacuation if the damage is limited. However, for extensive structural renovation, a temporary evacuation may be recommended to ensure safety, and the contractor will explain this in their proposal.
Does waterproofing require removing existing tiles?
It depends on the site condition. Sometimes surface waterproofing can be applied over tiles, while deep leaks require tile removal to treat the layer underneath. A technician will determine the best option after inspection.
Where does epoxy coating & waterproofing for apartments start in Makkah?
We start with surface moisture reading (epoxy is applied only when the substrate is dry enough), then careful preparation (grinding and cleaning for adhesion).
What does epoxy coating & waterproofing cost in Makkah?
From our published price list: Epoxy coating (per m²) SAR 35–95 per m². Quantities are confirmed at the inspection.
What do I receive after the work?
The epoxy system, thickness and curing time, in a technical report that carries a verification code.
What we advise against
- Coating over a damp surface
What you receive
You receive: the epoxy system, thickness and curing time, in a technical report with a verification code.
If you live in Makkah and are new to the area
- You can message us on WhatsApp in English; the booking details are sent back to you in the chat to confirm before the visit.
- The Saudi weekend is Friday and Saturday; mention your preferred day and time when booking.
- Have access ready to the water meter, the tank hatches, the roof and the main valve; in apartment buildings the roof keys are often with the building guard (haris).
- Prices are in Saudi riyals (SAR); the final price is confirmed after the inspection, before any work starts.
Sources and method
- SRTM (NASA) open data
- Kashf team
- Customer questions (reviewed)
- Owner price list for Makkah
- Local pages are published only after a quality gate: real local facts, text similarity of no more than 15% with any other English page, and a claims check.
- النسخة العربية