Epoxy coating & waterproofing for schools in Makkah
In short: Epoxy coating & waterproofing for schools in Makkah starts with the moisture meter for ceilings and walls, then the thickness measurement at spread-out points, before anything is opened. The centre of Makkah sits about 301 m above sea level (SRTM open elevation data). Pricing starts from Epoxy coating (per m²) (SAR 35–95 per m²), and other items are quoted after the visit.
Why epoxy coating & waterproofing differs in Makkah
Team note on Makkah: Kashf teams serve this city and its nearby districts with the same documented inspection standard: device-based leak detection without demolition, a written report, and a clear scope before any work begins.. The centre of Makkah sits about 301 m above sea level (SRTM open elevation data).
The first thing checked on a school job in Makkah is the ground the building sits on, because the centre of the city lies about 301 m above sea level according to SRTM open elevation data. That height matters for how rain drains off roofs, courtyards and car parks, and it shapes where water is likely to pool or find its way toward walls and floors. Before any product is chosen, the technician looks at the fall of the surfaces around the school, the outlets for roof water, and any low corners where moisture could sit. Quoted rates are a useful starting point for planning: epoxy coating runs SAR 35–95 per m², basement waterproofing SAR 55–160 per m², and crack injection SAR 40–125 per metre. Where a school has a basement or a lower storey partly below ground, that area is treated with more care than an open roof.
Several things are left to the site visit, because they cannot be judged from a plan. The actual condition of each surface has to be seen in person: whether the existing coating is lifting, where cracks run and how wide they are, whether old bitumen membrane is still sound, and how the bathroom floors and their falls behave under use. The technician also needs to confirm which areas are wet every day and which only see occasional water, since that decides between spray foam at SAR 20–45 per m², liquid roof waterproofing at SAR 10–25 per m², and XPS boards at SAR 15–30 per m². Water tanks on the roof or in the grounds should be opened and inspected, because tank internal coating at SAR 25–65 per m² depends on the state of the old lining and the concrete beneath it. Access, the hours the school can be closed, and the safe routes for materials are also settled on site.
To help the technician arrive prepared, it is useful to have the school's drawings, a list of the areas that flood or leak, dates of earlier repairs, and any notes on which surfaces students and staff use most. A clear map of roof drains, tank locations and basement access saves time. Keep the work zones separate from classrooms where possible, and agree on quiet hours for noisy stages such as grinding or injection. With these details gathered in advance, the site visit can focus on confirming the scope rather than discovering it, and the chosen system can be matched to each part of the building with fewer surprises.
For schools, the larger jobs are planned for weekends and holidays.
Signs worth paying attention to
These are the signs most often linked to epoxy coating & waterproofing:
- Oil stains on a floor
- A warehouse floor that is wearing away
- A tank that needs an easy-to-clean surface
Causes we see in the field
- A common cause: a damp surface that ruins adhesion.
- A common cause: insufficient preparation.
Tools and methods, and when we use them
| Method | What it helps with | Its role in Makkah |
|---|---|---|
| Thickness measurement at spread-out points | Whether the thickness in the quote was achieved | Limits: for foam and liquid-applied layers |
| Moisture meter for ceilings and walls | Where water is entering now, from inside | Limits: measures the effect, not the water path |
| Fill test with level monitoring | Whether a tank coating holds after the work | Limits: takes time to monitor the level |
From the first visit to the report
- Surface moisture reading: Epoxy is applied only when the substrate is dry enough.
- Careful preparation: Grinding and cleaning for adhesion.
- Layers: Primer and body coats as specified.
- Inspection: Thickness and curing are checked.
Quick comparison: facts and costs in Makkah
| Item | Value | Source |
|---|---|---|
| District profile | The centre of Makkah sits about 301 m above sea level (SRTM open elevation data) | SRTM (NASA) open data |
| District profile | Team note on Makkah: Kashf teams serve this city and its nearby districts with the same documented inspection standard: device-based leak detection without demolition, a written report, and a clear scope before any work begins. | Kashf team |
| Epoxy coating (per m²) | SAR 35–95 per m² | Owner price list (Makkah) |
Short answers for Makkah
What does finishing work typically include?
It covers plastering, painting, flooring, stone or marble walls, ceilings, gypsum, doors, windows, and final electrical and plumbing installations. You can request full or partial finishing, with the scope clearly defined in the price quote.
Is it possible to renovate the building without evacuating the residents?
In many cases it can be carried out in phases without a full evacuation if the damage is limited. However, for extensive structural renovation, a temporary evacuation may be recommended to ensure safety, and the contractor will explain this in their proposal.
Does waterproofing require removing existing tiles?
It depends on the site condition. Sometimes surface waterproofing can be applied over tiles, while deep leaks require tile removal to treat the layer underneath. A technician will determine the best option after inspection.
Where does epoxy coating & waterproofing for schools start in Makkah?
We start with surface moisture reading (epoxy is applied only when the substrate is dry enough), then careful preparation (grinding and cleaning for adhesion).
What does epoxy coating & waterproofing cost in Makkah?
From our published price list: Epoxy coating (per m²) SAR 35–95 per m². Quantities are confirmed at the inspection.
What do I receive after the work?
The epoxy system, thickness and curing time, in a technical report that carries a verification code.
What we advise against
- Coating over a damp surface
The written outputs
The written output: the epoxy system, thickness and curing time. The report is numbered and can be checked with its verification code.
If you live in Makkah and are new to the area
- The Saudi weekend is Friday and Saturday; mention your preferred day and time when booking.
- You can message us on WhatsApp in English; the booking details are sent back to you in the chat to confirm before the visit.
- If you rent, tell your landlord or building management before the visit and agree in writing who pays; the written report can be shared with them.
- Keep photos of the problem and of any earlier repairs — they help the technician compare before and after.
Sources and method
- SRTM (NASA) open data
- Kashf team
- Customer questions (reviewed)
- Owner price list for Makkah
- Local pages are published only after a quality gate: real local facts, text similarity of no more than 15% with any other English page, and a claims check.
- النسخة العربية