Home About Us Services Guide Emergency Service Our Services Documented Report Tools Hub Glossary Blog Service Cities FAQ Pest Control Contact Us
Book onlineTracking number at once · no holdCall nowWater leak emergencyWhatsAppMessage us

Roof waterproofing for apartments in Al Mhmdya, Riyadh

Prepared by the technical team · editorial review · last updated 13 November 2026 · Sources

الخلاصة: In short: In Al Mhmdya (Riyadh), roof waterproofing for apartments begins with the roof, falls and drains survey and the moisture meter for ceilings and walls; nothing is opened until the position is clear. The centre of Al Mhmdya sits about 625 m above sea level (SRTM open elevation data).

Before we start: what we know about Al Mhmdya

The centre of Al Mhmdya is at 24.7326, 46.6503, about 3.3 km from the centre of Riyadh, with an approximate radius of 2 km. The approximate area shown on the map is centred here. Main roads in or near Al Mhmdya: King Fahd Road, King Abdullah Road, Al Takhassusi Road.

The centre of Al Mhmdya sits about 625 m above sea level (SRTM open elevation data). The nearest wadi channel is about 1.9 km from the centre of Al Mhmdya (OpenStreetMap).

The roof of an apartment building in Al Mhmdya, Riyadh, starts with its location. The centre of Al Mhmdya is at 24.7326, 46.6503, about 3.3 km from the centre of Riyadh, with an approximate radius of 2 km. The centre sits about 625 m above sea level, according to SRTM open elevation data. The nearest wadi channel is about 1.9 km from the centre, which means that when rain falls heavily, water can run off quickly across hard ground and gather where the roof drains are least able to cope. Because of this, the first things a technician looks at on a roof here are the drainage outlets, the upstands around the edge, and whether any ponding has already left marks or staining on the parapet walls.

Some points cannot be settled from a description alone and are left to the site visit. The technician will walk the roof to find cracks, blistering, lifted seams and areas where old waterproofing has failed. They will check whether the existing layer is a bitumen membrane, a liquid coating or boards laid over the slab, since this decides which repair is realistic. They will also look at the junctions with rooftop tanks, plant bases and stair enclosures, and note how far the water sits from the nearest outlet. Costs are only indicative until this is done. For reference, liquid roof waterproofing is SAR 10–25 per m², bitumen membrane is SAR 15–35 per m², spray foam is SAR 20–45 per m², and XPS boards are SAR 15–30 per m², but the final figure depends on the area and condition found on the day.

To help the technician, the resident or property manager should have the building's age, the number of floors, and any previous roof repair records ready. It is useful to note where water has entered previous ceilings, and to say whether any rooftop tank is in use, since tank internal coating is priced separately at SAR 25–65 per m². Photos taken after a rainfall, showing where water collected, are very helpful. Access arrangements for the roof and any stairwell keys should be confirmed in advance so the visit can cover the full roof in one trip.

Service-area map for waterproofing & insulation in Al Mhmdya, RiyadhAl MhmdyaCentre: Riyadh1 kmNSchematic · coordinates © OpenStreetMap contributors (ODbL)
The approximate extent of Al Mhmdya (radius about 2 km) — the exact location of your job is set when you book.

In an apartment, a problem may start in your unit or in a shared line; we separate the two before any work.

Signs worth paying attention to

These are the signs most often linked to roof waterproofing:

The most common causes

Tools and methods, and when we use them

ToolWhat it findsWhen we use it in Al Mhmdya
Roof, falls and drains surveyPonding areas and the condition of the old layerLimits: shows the condition, not the material alone
Moisture meter for ceilings and wallsWhere water is entering now, from insideLimits: measures the effect, not the water path
Flood testWhether the waterproofing holds before it is coveredLimits: for roofs with drains and wet areas before tiling

From the first visit to the report

  1. Survey: Falls, drains and the condition of the old layer are recorded.
  2. Preparation: Cleaning and repairs before any new layer.
  3. Primer: The base coat that the system needs.
  4. Waterproofing layers and details: Corners, upstands and bases get their own detail.
  5. Flood test: The roof is flooded and checked before it is covered.

Al Mhmdya in facts and sources

ItemValueSource
District profileThe nearest wadi channel is about 1.9 km from the centre of Al Mhmdya (OpenStreetMap)© OpenStreetMap contributors (ODbL)
RoadsMain roads in or near Al Mhmdya: King Fahd Road, King Abdullah Road, Al Takhassusi RoadKashf data (owner)
District profileThe centre of Al Mhmdya sits about 625 m above sea level (SRTM open elevation data)SRTM (NASA) open data
Centre of Al Mhmdya24.73258, 46.65025© OSM
Distance from the centre of Riyadhabout 3.3 kmCalculated from the coordinates
Liquid roof waterproofing (per m²)SAR 10–25 per m²Owner price list (Riyadh)
Bitumen membrane (per m²)SAR 15–35 per m²Owner price list (Riyadh)

Questions from Al Mhmdya

Is Al Mhmdya within our service area in Riyadh?

The centre of Al Mhmdya is at 24.7326, 46.6503, about 3.3 km from the centre of Riyadh. The exact address of your property is set when you book.

What is the first step of roof waterproofing for apartments?

We start with survey (falls, drains and the condition of the old layer are recorded), then preparation (cleaning and repairs before any new layer).

How much does roof waterproofing cost in Al Mhmdya?

From our published price list: Liquid roof waterproofing (per m²) SAR 10–25 per m²; Bitumen membrane (per m²) SAR 15–35 per m². Quantities are confirmed at the inspection.

What do I get at the end?

A quality record with photos and the flood-test result, in a technical report that carries a verification code.

Mistakes that cost more

What you receive

The written output: a quality record with photos and the flood-test result. The report is numbered and can be checked with its verification code.

Practical notes for residents of Al Mhmdya

  • You can message us on WhatsApp in English; the booking details are sent back to you in the chat to confirm before the visit.
  • The Saudi weekend is Friday and Saturday; mention your preferred day and time when booking.
  • Prices are in Saudi riyals (SAR); the final price is confirmed after the inspection, before any work starts.
  • Have access ready to the water meter, the tank hatches, the roof and the main valve; in apartment buildings the roof keys are often with the building guard (haris).

Sources and method