Home About Us Services Guide Emergency Service Our Services Documented Report Tools Hub Glossary Blog Service Cities FAQ Pest Control Contact Us
Book onlineTracking number at once · no holdCall nowWater leak emergencyWhatsAppMessage us

Roof waterproofing for restaurants in Al Slymanya, Riyadh

Prepared by the technical team · editorial review · last updated 13 November 2026 · Sources

In short: Roof waterproofing for restaurants in Al Slymanya starts with the roof, falls and drains survey, then the moisture meter for ceilings and walls, before anything is opened. The centre of Al Slymanya sits about 612 m above sea level (SRTM open elevation data). Published price: Liquid roof waterproofing (per m²), SAR 10–25 per m²; anything else is quoted after the inspection.

Roof waterproofing in Al Slymanya: the local context

The centre of Al Slymanya is at 24.7088, 46.6945, about 2 km from the centre of Riyadh, with an approximate radius of 3.3 km. The service-area circle on the map below is drawn from this point. The centre of Al Slymanya sits about 612 m above sea level (SRTM open elevation data).

Main roads in or near Al Slymanya: King Fahd Road, King Abdulaziz Road, Abdulaziz bin Musaed bin Jalawi Road.

Start with the location, because it shapes what a technician looks at first. The centre of Al Slymanya sits at 24.7088, 46.6945, about 2 km from the centre of Riyadh, with an approximate radius of 3.3 km, and it sits about 612 m above sea level. For a restaurant roof, that means the district is inland and fairly elevated, so the first things checked are the condition of the roof surface, the drainage outlets, and any ponding after rain, since water that stands on a flat roof is the usual route into the kitchen ceiling below.

What is left to the site visit is the detail that no general description can settle. The technician needs to see the actual roof: whether the existing layer is liquid-applied, bitumen membrane or spray foam, whether there are cracks or blisters, how the upstands and parapets are finished, and where the roof penetrations for extract fans, grease ducts and air-conditioning units are placed. Restaurant roofs also carry heavy equipment and frequent foot traffic from staff and maintenance, so the visit should note any worn areas and any places where the membrane has been damaged by equipment being moved. The choice between a liquid roof system, a bitumen membrane, or an insulation layer using XPS boards is made on site, once the existing condition and the roof's use are known.

To help the technician, the customer should prepare a short set of information before the visit. Note when leaks were last seen and in which part of the kitchen or dining room, and whether the leaks follow heavy rain or happen during normal use. Share any previous roof works, the age of the building if known, and the positions of tanks or plant on the roof. Clear access to the roof and to the ceiling below is useful, so the team can trace water paths. Finally, mention any planned changes to kitchen equipment, since new extract systems affect where the roof must be sealed.

Service-area map for waterproofing & insulation in Al Slymanya, RiyadhAl SlymanyaCentre: Riyadh2 kmNSchematic · coordinates © OpenStreetMap contributors (ODbL)
Approximate area of Al Slymanya (radius about 3.3 km) — a schematic that does not show any customer address.

For restaurants, visits are planned outside service hours and recorded for the premises file.

Signs worth paying attention to

These are the signs most often linked to roof waterproofing:

Causes we see in the field

How we choose the tool in Al Slymanya

ToolWhat it findsWhen we use it in Al Slymanya
Flood testWhether the waterproofing holds before it is coveredLimits: for roofs with drains and wet areas before tiling
Roof, falls and drains surveyPonding areas and the condition of the old layerLimits: shows the condition, not the material alone
Moisture meter for ceilings and wallsWhere water is entering now, from insideLimits: measures the effect, not the water path

The steps in order

  1. Survey: Falls, drains and the condition of the old layer are recorded.
  2. Preparation: Cleaning and repairs before any new layer.
  3. Primer: The base coat that the system needs.
  4. Waterproofing layers and details: Corners, upstands and bases get their own detail.
  5. Flood test: The roof is flooded and checked before it is covered.

Facts and costs — Al Slymanya

ItemValueSource
District profileThe centre of Al Slymanya sits about 612 m above sea level (SRTM open elevation data)SRTM (NASA) open data
Centre of Al Slymanya24.70876, 46.69446© OSM
Distance from the centre of Riyadhabout 2 kmCalculated from the coordinates
RoadsMain roads in or near Al Slymanya: King Fahd Road, King Abdulaziz Road, Abdulaziz bin Musaed bin Jalawi RoadKashf data (owner)
Liquid roof waterproofing (per m²)SAR 10–25 per m²Owner price list (Riyadh)
Bitumen membrane (per m²)SAR 15–35 per m²Owner price list (Riyadh)

Short answers for Al Slymanya

Where is Al Slymanya within our coverage in Riyadh?

The centre of Al Slymanya is at 24.7088, 46.6945, about 2 km from the centre of Riyadh. The exact address of your property is set when you book.

Where does roof waterproofing for restaurants start in Al Slymanya?

We start with survey (falls, drains and the condition of the old layer are recorded), then preparation (cleaning and repairs before any new layer).

What does roof waterproofing cost in Al Slymanya?

From our published price list: Liquid roof waterproofing (per m²) SAR 10–25 per m²; Bitumen membrane (per m²) SAR 15–35 per m². Quantities are confirmed at the inspection.

What do I receive after the work?

A quality record with photos and the flood-test result, in a technical report that carries a verification code.

Common mistakes we see

What you get after the work

You receive: a quality record with photos and the flood-test result, in a technical report with a verification code.

If you live in Riyadh and are new to the area

  • Have access ready to the water meter, the tank hatches, the roof and the main valve; in apartment buildings the roof keys are often with the building guard (haris).
  • Prices are in Saudi riyals (SAR); the final price is confirmed after the inspection, before any work starts.
  • Keep photos of the problem and of any earlier repairs — they help the technician compare before and after.
  • If you rent, tell your landlord or building management before the visit and agree in writing who pays; the written report can be shared with them.

Sources and method