Roof waterproofing for apartments in Al Yrmwk, Riyadh
In short: In Al Yrmwk (Riyadh), roof waterproofing for apartments begins with the roof, falls and drains survey and the moisture meter for ceilings and walls; nothing is opened until the position is clear. The centre of Al Yrmwk sits about 598 m above sea level (SRTM open elevation data). Published price: Liquid roof waterproofing (per m²), SAR 10–25 per m²; anything else is quoted after the inspection.
What is specific about Al Yrmwk for roof waterproofing
The centre of Al Yrmwk is at 24.8085, 46.7835, about 15.2 km from the centre of Riyadh, with an approximate radius of 3.2 km. The service-area circle on the map below is drawn from this point. The centre of Al Yrmwk sits about 598 m above sea level (SRTM open elevation data).
Main roads in or near Al Yrmwk: Dammam Road, Sheikh Jaber Al-Ahmad Al-Sabah Road, Imam Abdullah bin Saud bin Abdulaziz Road.
Is a leaking apartment roof in Al Yrmwk something I can fix without tearing up the whole slab? For most owners in this district, the answer begins with the right system for the right surface. Al Yrmwk sits at 24.8085, 46.7835, roughly 15.2 km from the centre of Riyadh, within an approximate radius of 3.2 km, and its centre lies about 598 m above sea level. Liquid roof waterproofing is priced at SAR 10–25 per m², and bitumen membrane at SAR 15–35 per m², so a roof can be sealed with a membrane suited to its condition and budget. Where cracks are the source of water entry, crack injection is priced at SAR 40–125 per metre, and spray foam at SAR 20–45 per m² is another option for certain surfaces. Insulation boards such as XPS, at SAR 15–30 per m², can also be part of a roof improvement plan.
A site inspection normally starts with a walk across the full roof to map cracks, blisters, ponding areas and the condition of parapets, drains and outlets. The inspector then checks the junctions where the roof meets walls, rooftop water tanks and any penetrations for pipes or ducts, since these are common entry points for water. Moisture is noted on the ceilings below, especially in the top-floor apartments, so the source can be traced rather than guessed. The surface is tested for cleanliness and dryness, because most coatings and membranes need a sound base to bond properly. The inspector will then describe which areas need crack injection, which need a full membrane, and whether the tank interior also needs a separate coating, with each item priced by its unit rate.
Before the visit, gather any earlier repair records, a note of when leaks first appeared and which rooms were affected, and photos taken after rain if you have them. Clear the roof of loose items, plants and stored materials so the full surface can be reviewed, and make sure access to the roof and any water tanks is open. Tell the inspector about any previous coatings, as old layers can affect how new materials adhere. Having the building's roof and tank details ready helps the inspection finish in one visit, and lets you compare the unit rates against a clear scope of work.
In an apartment, a problem may start in your unit or in a shared line; we separate the two before any work.
Signs that call for roof waterproofing
These are the signs most often linked to roof waterproofing:
- Stains on the top-floor ceiling after rain
- Water pooling on the roof
- The old waterproofing is cracking
Causes we see in the field
- Damaged waterproofing around tank and AC bases — we check this before anything else.
- A common cause: wrong falls towards the drains.
- A common cause: cracks in the roof slab.
Tools and methods, and when we use them
| Tool | What it finds | When we use it in Al Yrmwk |
|---|---|---|
| Flood test | Whether the waterproofing holds before it is covered | Limits: for roofs with drains and wet areas before tiling |
| Roof, falls and drains survey | Ponding areas and the condition of the old layer | Limits: shows the condition, not the material alone |
| Moisture meter for ceilings and walls | Where water is entering now, from inside | Limits: measures the effect, not the water path |
The steps in order
- Survey: Falls, drains and the condition of the old layer are recorded.
- Preparation: Cleaning and repairs before any new layer.
- Primer: The base coat that the system needs.
- Waterproofing layers and details: Corners, upstands and bases get their own detail.
- Flood test: The roof is flooded and checked before it is covered.
Facts and costs — Al Yrmwk
| Item | Value | Source |
|---|---|---|
| District profile | The centre of Al Yrmwk sits about 598 m above sea level (SRTM open elevation data) | SRTM (NASA) open data |
| Centre of Al Yrmwk | 24.80847, 46.78350 | © OSM |
| Distance from the centre of Riyadh | about 15.2 km | Calculated from the coordinates |
| Roads | Main roads in or near Al Yrmwk: Dammam Road, Sheikh Jaber Al-Ahmad Al-Sabah Road, Imam Abdullah bin Saud bin Abdulaziz Road | Kashf data (owner) |
| Liquid roof waterproofing (per m²) | SAR 10–25 per m² | Owner price list (Riyadh) |
| Bitumen membrane (per m²) | SAR 15–35 per m² | Owner price list (Riyadh) |
Questions from Al Yrmwk
Is Al Yrmwk within our service area in Riyadh?
The centre of Al Yrmwk is at 24.8085, 46.7835, about 15.2 km from the centre of Riyadh. The exact address of your property is set when you book.
What is the first step of roof waterproofing for apartments?
We start with survey (falls, drains and the condition of the old layer are recorded), then preparation (cleaning and repairs before any new layer).
How much does roof waterproofing cost in Al Yrmwk?
From our published price list: Liquid roof waterproofing (per m²) SAR 10–25 per m²; Bitumen membrane (per m²) SAR 15–35 per m². Quantities are confirmed at the inspection.
What do I get at the end?
A quality record with photos and the flood-test result, in a technical report that carries a verification code.
What we advise against
- Covering the waterproofing before the flood test
- Ignoring the tank bases
What you get after the work
You receive: a quality record with photos and the flood-test result, in a technical report with a verification code.
If you live in Riyadh and are new to the area
- Prices are in Saudi riyals (SAR); the final price is confirmed after the inspection, before any work starts.
- Have access ready to the water meter, the tank hatches, the roof and the main valve; in apartment buildings the roof keys are often with the building guard (haris).
- If you rent, tell your landlord or building management before the visit and agree in writing who pays; the written report can be shared with them.
- Keep photos of the problem and of any earlier repairs — they help the technician compare before and after.
Sources and method
- © OpenStreetMap contributors (ODbL)
- SRTM (NASA) open data
- Kashf data (owner)
- Owner price list for Riyadh
- Local pages are published only after a quality gate: real local facts, text similarity of no more than 15% with any other English page, and a claims check.
- النسخة العربية