Home About Us Services Guide Emergency Service Our Services Documented Report Tools Hub Glossary Blog Service Cities FAQ Pest Control Contact Us
Book onlineTracking number at once · no holdCall nowWater leak emergencyWhatsAppMessage us

Floor & balcony waterproofing for apartments in Alkharj

Prepared by the technical team · editorial review · last updated 13 November 2026 · Sources

In short: In Alkharj (Alkharj), floor & balcony waterproofing for apartments begins with the roof, falls and drains survey and the moisture meter for ceilings and walls; nothing is opened until the position is clear. The centre of Alkharj sits about 439 m above sea level (SRTM open elevation data). Pricing starts from Bathroom waterproofing (per m²) (SAR 15–40 per m²), and other items are quoted after the visit.

Before we start: what we know about Alkharj

The centre of Alkharj sits about 439 m above sea level (SRTM open elevation data). Main roads in or near Alkharj: King Abdullah Road.

Team note on Alkharj: Kashf teams serve this city and its nearby districts with the same documented inspection standard: device-based leak detection without demolition, a written report, and a clear scope before any work begins..

The most common problem with floor and balcony waterproofing in apartments is water getting into the slab below through hairline cracks and failed joints at the edges. On balconies, water often sits against the threshold to the living room and slowly seeps into the ceiling of the flat below, so the damage first shows as stains or peeling paint on a neighbour's ceiling. Inside the flat, the same thing happens around bathroom floors, where tiles and grout let water pass into the structure. Because the leak travels, the visible sign is often far from its real source, which is why a proper inspection matters more than a quick surface patch.

Alkharj sits at a fairly high elevation, with the centre about 439 m above sea level, and the approach reflects that. Rain in the region tends to arrive in short, heavy bursts rather than long soaks, so water pools on balconies and runs quickly toward drains and joints. This favours solutions that bridge small movement in the slab and seal the surface completely. For balconies and open terraces, liquid roof waterproofing at SAR 8–25 per m² or a bitumen membrane at SAR 15–35 per m² are common options, while epoxy coating at SAR 35–90 per m² suits floors that take foot traffic and need a tough finish. Crack injection at SAR 40–120 per metre is often needed first, because a crack left unsealed will defeat any coating laid over it. Bathrooms usually fall within SAR 15–40 per m² for waterproofing.

Before the visit, ask the provider which of these methods they propose and why, and request an itemised quote that states the per-m² or per-metre basis for each line. Ask whether they will check the ceiling below a leaking balcony or bathroom, since that is where the evidence usually sits. Confirm how they will prepare the surface, how crack injection will be handled, and how long the coating needs to cure before it is walked on. Ask whether the work includes protecting drains and thresholds. A clear, specific answer to these questions tells you more about the job than any general promise.

Service-area map for waterproofing & insulation in AlkharjAlkharj2 kmNSchematic · coordinates from Kashf data
The approximate extent of Alkharj — the exact location of your job is set when you book.

In an apartment, a problem may start in your unit or in a shared line; we separate the two before any work.

When do you need floor & balcony waterproofing?

If you notice one of these signs in Alkharj, it is a good moment to talk to the team:

The most common causes

How we choose the tool in Alkharj

ToolWhat it findsWhen we use it in Alkharj
Flood testWhether the waterproofing holds before it is coveredLimits: for roofs with drains and wet areas before tiling
Roof, falls and drains surveyPonding areas and the condition of the old layerLimits: shows the condition, not the material alone
Moisture meter for ceilings and wallsWhere water is entering now, from insideLimits: measures the effect, not the water path

From the first visit to the report

  1. Checking the falls: Where water collects and where it should go.
  2. Details: Thresholds, drains and upstands.
  3. Waterproofing: The layer is applied and protected.
  4. Flood test: Tested before the finish goes on.

Alkharj in facts and sources

ItemValueSource
RoadsMain roads in or near Alkharj: King Abdullah RoadKashf data (owner)
District profileThe centre of Alkharj sits about 439 m above sea level (SRTM open elevation data)SRTM (NASA) open data
District profileTeam note on Alkharj: Kashf teams serve this city and its nearby districts with the same documented inspection standard: device-based leak detection without demolition, a written report, and a clear scope before any work begins.Kashf team
Bathroom waterproofing (per m²)SAR 15–40 per m²Owner price list (Alkharj)

Short answers for Alkharj

Does an underground tank require waterproofing even if it is new?

Yes, concrete is naturally porous, which can lead to leaks or groundwater seepage. Applying epoxy or cementitious insulation from the start maintains water quality and protects the structure from corrosion.

Do you need to evacuate the building during renovation work?

It depends on the type and scope of the work. Surface work such as plastering and painting usually does not require evacuation, while partial or full evacuation may be advised in cases of structural reinforcement, and the contractor determines this after inspection.

What is the first step of floor & balcony waterproofing for apartments?

We start with checking the falls (where water collects and where it should go), then details (thresholds, drains and upstands).

How much does floor & balcony waterproofing cost in Alkharj?

From our published price list: Bathroom waterproofing (per m²) SAR 15–40 per m². Quantities are confirmed at the inspection.

What do I get at the end?

The flood result and photos of the details, in a technical report that carries a verification code.

Common mistakes we see

What you get after the work

You receive: the flood result and photos of the details, in a technical report with a verification code.

Practical notes for residents of Alkharj

  • Have access ready to the water meter, the tank hatches, the roof and the main valve; in apartment buildings the roof keys are often with the building guard (haris).
  • Prices are in Saudi riyals (SAR); the final price is confirmed after the inspection, before any work starts.
  • Keep photos of the problem and of any earlier repairs — they help the technician compare before and after.
  • If you rent, tell your landlord or building management before the visit and agree in writing who pays; the written report can be shared with them.

Sources and method