Balady building restoration permit: what it covers and how to get it online

Updated: 7 min readBy the Azl technical teamHome, villa & palace restoration

Restoring an old stone wall with temporary shoring and crack injection
Restoring an old stone wall with temporary shoring and crack injection — Illustrative image

Before the first worker reaches a restoration site, there is a question many owners skip: do these works need a permit? Ignoring it can mean work stopped halfway or a fine that was easy to avoid. The good news is that the procedure is now almost fully electronic through the Balady platform of the Ministry of Municipalities and Housing.

This guide explains the Balady building restoration permit as the official service page describes it: what it covers, who can apply, and what the requirements and steps are. Procedural details can change, so check the service page on Balady before you apply to confirm the latest version.

What does a building restoration permit on Balady cover?

Balady describes the service as a way for owners to obtain a permit to restore a building to its previous condition through technical repairs, without structural modifications and without adding new elements. That restriction is the key to understanding the service: it is for repair, not for change.

Does your work fall under a restoration permit?
Type of workWithin the restoration permit?Note
Repairing cracks, spalling and rusted rebar, and restoring concrete coverUsually yesA repair that returns the element to its condition, on the engineering office's recommendation
Renewing insulation, finishes and paintUsually yesRestores condition without changing the structure
Restoring the facade with the same or similar materialsUsually yesA radical change to the facade's appearance is for the office to decide
Removing a load-bearing wall or cutting openings in structural elementsNoA structural modification, outside the scope of the service
Adding a floor, an annex or an extensionNoA new element, which has a different permit route
Structural strengthening that changes how an element behavesDecided by the engineering officeMay count as a structural modification depending on its nature
This classification is indicative and based on the service description on Balady. The final decision for your case rests with the engineering office or the platform.

Who can apply for a Balady restoration permit, and what is required?

The service page says the beneficiaries are individuals, government entities and establishments. It adds that the service also covers commercial properties, and that a tenant can apply using the building permit that belongs to the rented space.

Requirements according to the service page

  • A valid building permit for the building
  • A contract with an engineering office
  • Payment of the service fee
  • A commitment to remove restoration debris

Printable checklist — use your browser's print command.

A building permit is the basic condition, and the service steps mention choosing the building permit or the survey decision linked to the building. If your house is old and you cannot find its permit on the platform, start by contacting an engineering office or checking Balady to learn which route is available for your case, before you contract for any works.

How do you get the restoration permit online, step by step?

  1. 1

    Log in to Balady

    Use the National Single Sign-On, through the portal or the mobile app; according to its page the service is electronic only.

  2. 2

    Set the owner and the applicant type

    Owner, agent or tenant, depending on your case.

  3. 3

    Choose the building permit or survey decision

    The one linked to the building you plan to restore.

  4. 4

    Select the engineering office

    The office you have contracted; it will complete the data and the drawings.

  5. 5

    Acknowledge the debris removal

    An explicit commitment within the application, with a practical effect on your execution plan.

  6. 6

    Send the request to the engineering office

    The office completes the information and prepares the required drawings.

  7. 7

    Pay the invoice

    The platform lists methods including SADAD, mada cards, credit cards and Apple Pay; the fee is worked out with the platform's fee calculator.

  8. 8

    Issue and print the permit

    After payment the permit is issued; you can print it and keep a copy on site.

Common mistakes when handling restoration permits

  • Starting before the permit is issued: then discovering that the work needs changes or extra drawings.
  • Slipping structural changes in under a restoration permit: for example removing a load-bearing wall during a renovation. This falls outside the service and can endanger the building.
  • Ignoring the debris commitment: leaving rubble in front of the house or in the street breaches an undertaking you signed.
  • Leaving the paperwork to the contractor alone: the permit requires an engineering office; the contractor's role is execution.
  • Not documenting the condition before you start: before-restoration photos help the engineering office and any later discussion.

The debris removal commitment: what does it mean in practice?

The debris acknowledgement is not a formality. Restoration produces large amounts of broken tile, plaster, removed concrete and old insulation, and leaving them on the street or pavement harms neighbours and the district. The commitment also sits in a wider context: the Waste Management Law, issued by royal decree in 1443 AH, regulates the collection, transport, sorting, treatment and safe disposal of waste.

  • Agree in writing with the contractor who removes the debris and what it costs, before work starts.
  • Set aside a temporary spot inside the property boundary, or a suitable skip, instead of the pavement.
  • Clear the debris as you go rather than piling it up until the end of the project.
  • Keep separate any material that may need special handling, such as empty chemical containers, following the manufacturer's instructions.

How do you coordinate the permit with the restoration plan?

The practical order is: a technical survey that defines the scope of work, then a contract with the engineering office, then the permit application, then execution in the sequence that protects each stage. You will find the order of works in our guide to old villa restoration steps, and facade considerations specifically in house facade restoration.

If the inspection reveals structural damage, it is the licensed structural engineer who decides whether repair under a restoration permit is enough or whether strengthening or modification with a different route is needed. To budget the works once the scope is clear, see home restoration cost in Saudi Arabia.

The team behind home restoration at Azl works after the permit is issued and within what the engineering office approves, and follows the agreed debris removal plan. If you would like an on-site assessment first, you can send a request. For any general municipal report, the Ministry offers the 940 reporting channel, as its official portal states.

Frequently asked questions

Do I need a permit to restore only the inside of my house?

It depends on the nature and scope of the work. Works that return a building to its condition through technical repairs have a restoration permit service on Balady. To be sure whether a specific job needs one, check the service page on the platform or ask the engineering office before you start; that is cheaper than having work stopped later.

How long does a Balady restoration permit take?

The service page on Balady states a completion time of one to ten days. The real duration depends on how quickly the engineering office completes the data and drawings and the fee is paid, so have the building permit and the engineering office contract ready in advance.

Can a tenant obtain a restoration permit?

The service page says it covers commercial properties and that a tenant can apply using the building permit of the rented space. For rented residential property, it is wise to agree with the landlord in writing on the works and on who is responsible for the permit before anything begins.

Does a restoration permit cover adding a room or an annex?

No. The service is meant to return the building to its previous condition without structural modifications or new elements, and an addition is a new element. Adding a room, annex or floor needs a different permit route, which the engineering office will identify under the applicable requirements.

Why does the permit require an engineering office?

Because the office completes the application data, prepares the drawings and carries the technical responsibility that the works are repairs and not structural modifications. It also protects the owner, since decisions such as treating cracks or rusted rebar need an engineering opinion rather than the installer's guess.

What if I cannot find my house's old building permit?

The service steps mention choosing the building permit or the survey decision linked to the building. If your permit does not appear on the platform, do not start work; contact an engineering office or check Balady for the procedure available for your case, as the property data may need updating first.

Ask an engineer about your case

Write your question about this topic, and an Azl specialist will reply during working hours.

Topic: Balady building restoration permit: what it covers and how to get it online

Nothing is stored on this website; your message opens in WhatsApp for you to send to 0544027180. Privacy policy

References and sources

  1. Issuing a Building Restoration Permit — Balady Platform (MOMAH) · balady.gov.sa
  2. البوابة الرسمية لوزارة البلديات والإسكان — وزارة البلديات والإسكان · momah.gov.sa
  3. نظام إدارة النفايات — هيئة الخبراء بمجلس الوزراء · laws.boe.gov.sa

External links pass through Azl's Consumer Safety Center for checking before leading to other organisations' websites. Citing them does not imply they endorse Azl. Technical values are typical and vary by product; the final reference is the approved product's datasheet and the project design. Editorial policy