Al Muruj lies south of Al Quds Street in Arar, bordered by Sheikh Abdulaziz bin Baz Road and neighbouring Al Faisaliyah, Al Mansuriyah and Ar Rabwah. Its modern plan is dominated by family villas, so roof thermal insulation and waterproofing, whether during construction or afterwards, matters for cutting summer cooling loads and heating on cold winter nights. District guide

Why Al Muruj homes need epoxy flooring & coatings

Al Muruj lies in south Arar along Al Quds Street and Sheikh Abdulaziz bin Baz Road, and is dominated by villas. In villas epoxy is usually requested for the garage, store and laundry, sometimes for annexes and majlis rooms in glossy easy-clean systems. The city's cold winters and hot summers cause repeated expansion and contraction, so a flexible system is preferred. The city's heat speeds epoxy cure and shortens working time, so it is laid in cooler hours. The fix: mechanical preparation and moisture testing, then an epoxy system matched to the use.

Main roads
  • • Al Quds Street
  • • Sheikh Abdulaziz bin Baz Road
Common buildings
  • • villas

Materials and specifications

  • Epoxy primer: Seals the concrete pores and bonds the system; its type depends on slab moisture and porosity.
  • Roller-applied epoxy coating: Two thin coats for majlis rooms, diwaniyas, offices and light-traffic storage.
  • Self-levelling epoxy: A smooth seamless surface a few millimetres thick for showrooms, corridors, hospitals and kitchens.
  • Epoxy mortar with quartz sand: For heavy loads, forklifts and car parks; can be textured for slip resistance.
  • Aliphatic polyurethane topcoat: Improves scratch resistance and colour stability where light exposure is high, depending on the system.

We select products conforming to the relevant Saudi standards and apply them per the manufacturer's datasheet.

Execution plan in Al Muruj

  1. Assess the floor: concrete age, surface strength and moisture using the tests set in the system's data sheet
  2. Prepare the surface mechanically by grinding or shot-blasting, then vacuum all dust
  3. Repair cracks, holes and construction joints with epoxy filler or mortar
  4. Apply the primer, respecting surface temperature and dew-point margin
  5. Apply the system coats at the specified consumption and thickness, broadcasting sand for slip-resistant finishes
  6. Apply the topcoat and close the area until full cure before traffic and loads

Indicative prices for typical Al Muruj sizes

CaseSizeEstimated cost (SAR)Warranty
Smaller50 m²2,000 – 6,000Written, by work type
Typical125 m²4,400 – 15,000Written, by work type
Larger200 m²7,000 – 24,000Written, by work type

Indicative ranges excluding VAT, based on sizes common in the district; not a quote. Final price after inspection.

Approximate area125 m²
Current surface condition

Questions from Al Muruj residents

How much does epoxy flooring cost for a villa in Al Muruj, Arar?

In Al Muruj, for about 150 m² the indicative cost is SAR 5,250–18,000 before VAT (SAR 35–120 per m²). Prices are indicative and confirmed after inspection according to condition, material and access.

Which material is used for epoxy flooring in Al Muruj?

Two-coat epoxy for light use, self-levelling for clean areas, and quartz screed for heavy loads and traffic.

How long does epoxy flooring take in Al Muruj, and do you serve it?

The work takes typically two to five days including preparation, coats and curing before use. We serve Arar on request; once we receive your request from Al Muruj we coordinate a date by team availability and confirm it first.

Book an inspection in Al Muruj

Details are pre-filled from this page; add only what's specific to you, and your message reaches us neatly on WhatsApp.

Nothing is stored on this website; your message opens in WhatsApp for you to send to 0544027180. Privacy policy