Epoxy Flooring & Coatings in An Nahdah, Bisha
Azl — delivered with a written warranty, to the Saudi Building Code
About An Nahdah
An Nahdah lies on the edge of Bisha, with many farms offered for sale on Ar Ruqaita Street and the Ranyah–Bisha road, described by residents as quiet though some services are weak. The agricultural setting raises the chance of rodents, reptiles and flying insects entering homes, so periodic control and sealing of openings pay off, and farm rooms and rest houses need waterproofing against irrigation and rain. District guide
Why An Nahdah homes need epoxy flooring & coatings
Rest houses and farms and villas define An Nahdah in Bisha, beside Ar Ruqaita Street. At rest houses epoxy is used in service kitchens, stores, washrooms and pool surrounds with anti-slip systems. The surrounding farmland means big irrigation tanks and open spaces, so insulation is planned per facility use. The city's heat speeds epoxy cure and shortens working time, so it is laid in cooler hours. The fix: repair cracks and weak areas, test moisture, then a suitable primer and an epoxy system thick enough for the traffic.
- Main roads
- • Ar Ruqaita Street
- • Ranyah–Bisha Road
- Common buildings
- • rest houses and farms
- • villas
Materials and specifications
- Epoxy primer: Seals the concrete pores and bonds the system; its type depends on slab moisture and porosity.
- Roller-applied epoxy coating: Two thin coats for majlis rooms, diwaniyas, offices and light-traffic storage.
- Self-levelling epoxy: A smooth seamless surface a few millimetres thick for showrooms, corridors, hospitals and kitchens.
- Epoxy mortar with quartz sand: For heavy loads, forklifts and car parks; can be textured for slip resistance.
- Aliphatic polyurethane topcoat: Improves scratch resistance and colour stability where light exposure is high, depending on the system.
We select products conforming to the relevant Saudi standards and apply them per the manufacturer's datasheet.
Execution plan in An Nahdah
- Assess the floor: concrete age, surface strength and moisture using the tests set in the system's data sheet
- Prepare the surface mechanically by grinding or shot-blasting, then vacuum all dust
- Repair cracks, holes and construction joints with epoxy filler or mortar
- Apply the primer, respecting surface temperature and dew-point margin
- Apply the system coats at the specified consumption and thickness, broadcasting sand for slip-resistant finishes
- Apply the topcoat and close the area until full cure before traffic and loads
Indicative prices for typical An Nahdah sizes
| Case | Size | Estimated cost (SAR) | Warranty |
|---|---|---|---|
| Smaller | 100 m² | 3,500 – 12,000 | Written, by work type |
| Typical | 250 m² | 8,750 – 30,000 | Written, by work type |
| Larger | 400 m² | 14,000 – 48,000 | Written, by work type |
Indicative ranges excluding VAT, based on sizes common in the district; not a quote. Final price after inspection.
Questions from An Nahdah residents
How much does epoxy flooring cost for a rest house in An Nahdah, Bisha?
In An Nahdah, for about 250 m² the indicative cost is SAR 8,750–30,000 before VAT (SAR 35–120 per m²). Prices are indicative and confirmed after inspection according to condition, material and access.
Which material is used for epoxy flooring in An Nahdah?
Two-coat epoxy for light use, self-levelling for clean areas, and quartz screed for heavy loads and traffic.
How long does epoxy flooring take in An Nahdah, and do you serve it?
The work takes typically two to five days including preparation, coats and curing before use. We serve Bisha on request; once we receive your request from An Nahdah we coordinate a date by team availability and confirm it first.
Book an inspection in An Nahdah
Details are pre-filled from this page; add only what's specific to you, and your message reaches us neatly on WhatsApp.
Nothing is stored on this website; your message opens in WhatsApp for you to send to 0544027180. Privacy policy