Epoxy Flooring & Coatings in Badr, Dammam
Azl — delivered with a written warranty, to the Saudi Building Code
About Badr
Badr spans about 560 hectares in west Dammam, bounded by King Fahd Road and by Abu Bakr As Siddiq Street, which separates it from Uhud. Buildings are capped at three storeys, so its needs resemble other low-rise villa areas: thermal insulation for the top roof, waterproofing for wet floors and regular checks of roof drains. District guide
Why Badr homes need epoxy flooring & coatings
Badr in west Dammam is home to villas and apartment buildings, connected by King Fahd Road. In villas epoxy is usually requested for the garage, store and laundry, sometimes for annexes and majlis rooms in glossy easy-clean systems. High humidity affects bonding and curing, so application is scheduled in the least humid hours. The city's heat speeds epoxy cure and shortens working time, so it is laid in cooler hours. The fix: repair cracks and weak areas, test moisture, then a suitable primer and an epoxy system thick enough for the traffic.
- Main roads
- • King Fahd Road
- • Abu Bakr As Siddiq Street
- Common buildings
- • villas
- • apartment buildings
Materials and specifications
- Epoxy primer: Seals the concrete pores and bonds the system; its type depends on slab moisture and porosity.
- Roller-applied epoxy coating: Two thin coats for majlis rooms, diwaniyas, offices and light-traffic storage.
- Self-levelling epoxy: A smooth seamless surface a few millimetres thick for showrooms, corridors, hospitals and kitchens.
- Epoxy mortar with quartz sand: For heavy loads, forklifts and car parks; can be textured for slip resistance.
- Aliphatic polyurethane topcoat: Improves scratch resistance and colour stability where light exposure is high, depending on the system.
We select products conforming to the relevant Saudi standards and apply them per the manufacturer's datasheet.
Execution plan in Badr
- Assess the floor: concrete age, surface strength and moisture using the tests set in the system's data sheet
- Prepare the surface mechanically by grinding or shot-blasting, then vacuum all dust
- Repair cracks, holes and construction joints with epoxy filler or mortar
- Apply the primer, respecting surface temperature and dew-point margin
- Apply the system coats at the specified consumption and thickness, broadcasting sand for slip-resistant finishes
- Apply the topcoat and close the area until full cure before traffic and loads
Indicative prices for typical Badr sizes
| Case | Size | Estimated cost (SAR) | Warranty |
|---|---|---|---|
| Smaller | 50 m² | 2,000 – 6,000 | Written, by work type |
| Typical | 125 m² | 4,400 – 15,000 | Written, by work type |
| Larger | 200 m² | 7,000 – 24,000 | Written, by work type |
Indicative ranges excluding VAT, based on sizes common in the district; not a quote. Final price after inspection.
Questions from Badr residents
How much does epoxy flooring cost for a villa in Badr, Dammam?
In Badr, for about 150 m² the indicative cost is SAR 5,250–18,000 before VAT (SAR 35–120 per m²). Prices are indicative and confirmed after inspection according to condition, material and access.
Which system suits epoxy flooring in Badr?
Two-coat epoxy for light use, self-levelling for clean areas, and quartz screed for heavy loads and traffic.
How long does epoxy flooring take in Badr, and do you serve it?
The work takes typically two to five days including preparation, coats and curing before use. Dammam is one of the cities we serve directly; the inspection in Badr is scheduled by team availability.
Book an inspection in Badr
Details are pre-filled from this page; add only what's specific to you, and your message reaches us neatly on WhatsApp.
Nothing is stored on this website; your message opens in WhatsApp for you to send to 0544027180. Privacy policy