Epoxy Flooring & Coatings in Al Jawahir, Qatif
Azl — delivered with a written warranty, to the Saudi Building Code
About Al Jawahir
Al Jawahir lies southwest of Az Zahra in Qatif, with modern villas, duplexes and residential plots on streets such as Abdullah Al Bassam and Al Abdulwahid. New construction here is a chance to build roof and foundation waterproofing and thermal insulation in from the start rather than retrofit later, along with pre-slab soil treatment against termites. District guide
Why Al Jawahir homes need epoxy flooring & coatings
Villas and apartment buildings define Al Jawahir in Qatif, beside Abdullah Al Bassam Street. In villas epoxy is usually requested for the garage, store and laundry, sometimes for annexes and majlis rooms in glossy easy-clean systems. High humidity affects bonding and curing, so application is scheduled in the least humid hours. The city's heat speeds epoxy cure and shortens working time, so it is laid in cooler hours. The fix: mechanical preparation and moisture testing, then an epoxy system matched to the use.
- Main roads
- • Abdullah Al Bassam Street
- • Al Abdulwahid Street
- Common buildings
- • villas
- • apartment buildings
Materials and specifications
- Epoxy primer: Seals the concrete pores and bonds the system; its type depends on slab moisture and porosity.
- Roller-applied epoxy coating: Two thin coats for majlis rooms, diwaniyas, offices and light-traffic storage.
- Self-levelling epoxy: A smooth seamless surface a few millimetres thick for showrooms, corridors, hospitals and kitchens.
- Epoxy mortar with quartz sand: For heavy loads, forklifts and car parks; can be textured for slip resistance.
- Aliphatic polyurethane topcoat: Improves scratch resistance and colour stability where light exposure is high, depending on the system.
We select products conforming to the relevant Saudi standards and apply them per the manufacturer's datasheet.
Execution plan in Al Jawahir
- Assess the floor: concrete age, surface strength and moisture using the tests set in the system's data sheet
- Prepare the surface mechanically by grinding or shot-blasting, then vacuum all dust
- Repair cracks, holes and construction joints with epoxy filler or mortar
- Apply the primer, respecting surface temperature and dew-point margin
- Apply the system coats at the specified consumption and thickness, broadcasting sand for slip-resistant finishes
- Apply the topcoat and close the area until full cure before traffic and loads
Indicative prices for typical Al Jawahir sizes
| Case | Size | Estimated cost (SAR) | Warranty |
|---|---|---|---|
| Smaller | 50 m² | 2,000 – 6,000 | Written, by work type |
| Typical | 125 m² | 4,400 – 15,000 | Written, by work type |
| Larger | 200 m² | 7,000 – 24,000 | Written, by work type |
Indicative ranges excluding VAT, based on sizes common in the district; not a quote. Final price after inspection.
Questions from Al Jawahir residents
How much does epoxy flooring cost for a villa in Al Jawahir, Qatif?
In Al Jawahir, for about 150 m² the indicative cost is SAR 5,250–18,000 before VAT (SAR 35–120 per m²). Prices are indicative and confirmed after inspection according to condition, material and access.
Which material is used for epoxy flooring in Al Jawahir?
Two-coat epoxy for light use, self-levelling for clean areas, and quartz screed for heavy loads and traffic.
How long does epoxy flooring take in Al Jawahir, and do you serve it?
The work takes typically two to five days including preparation, coats and curing before use. We serve Qatif on request; once we receive your request from Al Jawahir we coordinate a date by team availability and confirm it first.
Book an inspection in Al Jawahir
Details are pre-filled from this page; add only what's specific to you, and your message reaches us neatly on WhatsApp.
Nothing is stored on this website; your message opens in WhatsApp for you to send to 0544027180. Privacy policy