Azl logo — azl.com.sa
Ar Rawdah — RafhaEstablished district with mixed-age buildings

Epoxy Flooring & Coatings in Ar Rawdah, Rafha

Azl — delivered with a written warranty, to the Saudi Building Code

About Ar Rawdah

Ar Rawdah in Rafha sits on Umar ibn Al Khattab Street and contains rental apartments alongside family homes of varying age. With several units sharing one building, insulating the common roof and water tanks is a priority, since any leak quickly reaches the upper flats, and thermal insulation trims both summer cooling and winter heating demand. District guide

Why Ar Rawdah homes need epoxy flooring & coatings

Apartment buildings and villas define Ar Rawdah in Rafha, beside Umar ibn Al Khattab Street. In apartment buildings basement and ground parking need floors that resist oil and dust, with bay markings and anti-slip ramps. The city's cold winters and hot summers cause repeated expansion and contraction, so a flexible system is preferred. The city's heat speeds epoxy cure and shortens working time, so it is laid in cooler hours. The fix: repair cracks and weak areas, test moisture, then a suitable primer and an epoxy system thick enough for the traffic.

Main roads
  • • Umar ibn Al Khattab Street
Common buildings
  • • apartment buildings
  • • villas

Materials and specifications

  • Epoxy primer: Seals the concrete pores and bonds the system; its type depends on slab moisture and porosity.
  • Roller-applied epoxy coating: Two thin coats for majlis rooms, diwaniyas, offices and light-traffic storage.
  • Self-levelling epoxy: A smooth seamless surface a few millimetres thick for showrooms, corridors, hospitals and kitchens.
  • Epoxy mortar with quartz sand: For heavy loads, forklifts and car parks; can be textured for slip resistance.
  • Aliphatic polyurethane topcoat: Improves scratch resistance and colour stability where light exposure is high, depending on the system.

We select products conforming to the relevant Saudi standards and apply them per the manufacturer's datasheet.

Execution plan in Ar Rawdah

  1. Assess the floor: concrete age, surface strength and moisture using the tests set in the system's data sheet
  2. Prepare the surface mechanically by grinding or shot-blasting, then vacuum all dust
  3. Repair cracks, holes and construction joints with epoxy filler or mortar
  4. Apply the primer, respecting surface temperature and dew-point margin
  5. Apply the system coats at the specified consumption and thickness, broadcasting sand for slip-resistant finishes
  6. Apply the topcoat and close the area until full cure before traffic and loads

Indicative prices for typical Ar Rawdah sizes

CaseSizeEstimated cost (SAR)Warranty
Smaller100 m²3,500 – 12,000Written, by work type
Typical250 m²8,750 – 30,000Written, by work type
Larger400 m²14,000 – 48,000Written, by work type

Indicative ranges excluding VAT, based on sizes common in the district; not a quote. Final price after inspection.

Approximate area250 m²
Current surface condition

Questions from Ar Rawdah residents

How much does epoxy flooring cost for an apartment building in Ar Rawdah, Rafha?

In Ar Rawdah, for about 250 m² the indicative cost is SAR 8,750–30,000 before VAT (SAR 35–120 per m²). Prices are indicative and confirmed after inspection according to condition, material and access.

Which material is used for epoxy flooring in Ar Rawdah?

For parking: epoxy or PU with anti-slip aggregate on ramps and bay markings.

How long does epoxy flooring take in Ar Rawdah, and do you serve it?

The work takes typically two to five days including preparation, coats and curing before use. We serve Rafha on request; once we receive your request from Ar Rawdah we coordinate a date by team availability and confirm it first.

Book an inspection in Ar Rawdah

Details are pre-filled from this page; add only what's specific to you, and your message reaches us neatly on WhatsApp.

Nothing is stored on this website; your message opens in WhatsApp for you to send to 0544027180. Privacy policy