Epoxy Flooring & Coatings in Al Qadisiyah, Riyadh
Azl — delivered with a written warranty, to the Saudi Building Code
About Al Qadisiyah
Al Qadisiyah spreads over about 11.8 square kilometres between Dammam Road to the north and Khurais Road to the south, with Al-Janadriyah Road on its east. It has shifted from an older area into a zone of urban expansion with varied villa and apartment styles, so some buildings need worn insulation repaired while others need first-time insulation during finishing. District guide
Why Al Qadisiyah homes need epoxy flooring & coatings
Al Qadisiyah in east Riyadh is home to villas and apartment buildings, connected by Dammam Road. In villas epoxy is usually requested for the garage, store and laundry, sometimes for annexes and majlis rooms in glossy easy-clean systems. The city's heat speeds epoxy cure and shortens working time, so it is laid in cooler hours. The fix: repair cracks and weak areas, test moisture, then a suitable primer and an epoxy system thick enough for the traffic.
- Main roads
- • Dammam Road
- • Khurais Road
- • Al-Janadriyah Road
- Common buildings
- • villas
- • apartment buildings
Materials and specifications
- Epoxy primer: Seals the concrete pores and bonds the system; its type depends on slab moisture and porosity.
- Roller-applied epoxy coating: Two thin coats for majlis rooms, diwaniyas, offices and light-traffic storage.
- Self-levelling epoxy: A smooth seamless surface a few millimetres thick for showrooms, corridors, hospitals and kitchens.
- Epoxy mortar with quartz sand: For heavy loads, forklifts and car parks; can be textured for slip resistance.
- Aliphatic polyurethane topcoat: Improves scratch resistance and colour stability where light exposure is high, depending on the system.
We select products conforming to the relevant Saudi standards and apply them per the manufacturer's datasheet.
Execution plan in Al Qadisiyah
- Assess the floor: concrete age, surface strength and moisture using the tests set in the system's data sheet
- Prepare the surface mechanically by grinding or shot-blasting, then vacuum all dust
- Repair cracks, holes and construction joints with epoxy filler or mortar
- Apply the primer, respecting surface temperature and dew-point margin
- Apply the system coats at the specified consumption and thickness, broadcasting sand for slip-resistant finishes
- Apply the topcoat and close the area until full cure before traffic and loads
Indicative prices for typical Al Qadisiyah sizes
| Case | Size | Estimated cost (SAR) | Warranty |
|---|---|---|---|
| Smaller | 50 m² | 2,000 – 6,000 | Written, by work type |
| Typical | 125 m² | 4,400 – 15,000 | Written, by work type |
| Larger | 200 m² | 7,000 – 24,000 | Written, by work type |
Indicative ranges excluding VAT, based on sizes common in the district; not a quote. Final price after inspection.
Questions from Al Qadisiyah residents
How much does epoxy flooring cost for a villa in Al Qadisiyah, Riyadh?
In Al Qadisiyah, for about 150 m² the indicative cost is SAR 5,250–18,000 before VAT (SAR 35–120 per m²). Prices are indicative and confirmed after inspection according to condition, material and access.
Which system suits epoxy flooring in Al Qadisiyah?
Two-coat epoxy for light use, self-levelling for clean areas, and quartz screed for heavy loads and traffic.
How long does epoxy flooring take in Al Qadisiyah, and do you serve it?
The work takes typically two to five days including preparation, coats and curing before use. Riyadh is one of the cities we serve directly; the inspection in Al Qadisiyah is scheduled by team availability.
Book an inspection in Al Qadisiyah
Details are pre-filled from this page; add only what's specific to you, and your message reaches us neatly on WhatsApp.
Nothing is stored on this website; your message opens in WhatsApp for you to send to 0544027180. Privacy policy