Azl logo — azl.com.sa
Ar Raed — West RiyadhEstablished district with mixed-age buildings

Epoxy Flooring & Coatings in Ar Raed, Riyadh

Azl — delivered with a written warranty, to the Saudi Building Code

About Ar Raed

Ar Raed lies between King Khalid Road to the west and Prince Turki bin Abdulaziz Al-Awwal Road to the east, with King Abdullah Road to the north and Al Orouba Road to the south, near King Saud University. Villas and gated compounds dominate, and their wide roofs and annexes need durable waterproofing and thermal insulation, with attention to shared compound tanks. District guide

Why Ar Raed homes need epoxy flooring & coatings

Villas define Ar Raed in west Riyadh, beside King Khalid Road. In villas epoxy is usually requested for the garage, store and laundry, sometimes for annexes and majlis rooms in glossy easy-clean systems. The city's heat speeds epoxy cure and shortens working time, so it is laid in cooler hours. The fix: repair cracks and weak areas, test moisture, then a suitable primer and an epoxy system thick enough for the traffic.

Main roads
  • • King Khalid Road
  • • Prince Turki bin Abdulaziz Al-Awwal Road
  • • King Abdullah Road
  • • Al Orouba Road
Nearby landmarks
  • • King Saud University
Common buildings
  • • villas

Materials and specifications

  • Epoxy primer: Seals the concrete pores and bonds the system; its type depends on slab moisture and porosity.
  • Roller-applied epoxy coating: Two thin coats for majlis rooms, diwaniyas, offices and light-traffic storage.
  • Self-levelling epoxy: A smooth seamless surface a few millimetres thick for showrooms, corridors, hospitals and kitchens.
  • Epoxy mortar with quartz sand: For heavy loads, forklifts and car parks; can be textured for slip resistance.
  • Aliphatic polyurethane topcoat: Improves scratch resistance and colour stability where light exposure is high, depending on the system.

We select products conforming to the relevant Saudi standards and apply them per the manufacturer's datasheet.

Execution plan in Ar Raed

  1. Assess the floor: concrete age, surface strength and moisture using the tests set in the system's data sheet
  2. Prepare the surface mechanically by grinding or shot-blasting, then vacuum all dust
  3. Repair cracks, holes and construction joints with epoxy filler or mortar
  4. Apply the primer, respecting surface temperature and dew-point margin
  5. Apply the system coats at the specified consumption and thickness, broadcasting sand for slip-resistant finishes
  6. Apply the topcoat and close the area until full cure before traffic and loads

Indicative prices for typical Ar Raed sizes

CaseSizeEstimated cost (SAR)Warranty
Smaller50 m²2,000 – 6,000Written, by work type
Typical125 m²4,400 – 15,000Written, by work type
Larger200 m²7,000 – 24,000Written, by work type

Indicative ranges excluding VAT, based on sizes common in the district; not a quote. Final price after inspection.

Approximate area125 m²
Current surface condition

Questions from Ar Raed residents

How much does epoxy flooring cost for a villa in Ar Raed, Riyadh?

In Ar Raed, for about 150 m² the indicative cost is SAR 5,250–18,000 before VAT (SAR 35–120 per m²). Prices are indicative and confirmed after inspection according to condition, material and access.

Which material is used for epoxy flooring in Ar Raed?

Two-coat epoxy for light use, self-levelling for clean areas, and quartz screed for heavy loads and traffic. Near King Saud University we also plan access and working hours.

How long does epoxy flooring take in Ar Raed, and do you serve it?

The work takes typically two to five days including preparation, coats and curing before use. Riyadh is one of the cities we serve directly; the inspection in Ar Raed is scheduled by team availability.

Book an inspection in Ar Raed

Details are pre-filled from this page; add only what's specific to you, and your message reaches us neatly on WhatsApp.

Nothing is stored on this website; your message opens in WhatsApp for you to send to 0544027180. Privacy policy