Epoxy Flooring & Coatings in Ar Rawdah, Sakaka
Azl — delivered with a written warranty, to the Saudi Building Code
About Ar Rawdah
Ar Rawdah is a Sakaka district listed on property platforms and connected to King Fahd bin Abdulaziz Road, where shops serve the area. Homes close to the commercial road need attention to insect entry points through drains and doors, and residents benefit from roof thermal insulation to soften summer heat and cold winter nights in Al-Jouf. District guide
Why Ar Rawdah homes need epoxy flooring & coatings
Villas and shops and commercial buildings define Ar Rawdah in Sakaka, beside King Fahd bin Abdulaziz Road. In villas epoxy is usually requested for the garage, store and laundry, sometimes for annexes and majlis rooms in glossy easy-clean systems. The city's cold winters and hot summers cause repeated expansion and contraction, so a flexible system is preferred. The city's heat speeds epoxy cure and shortens working time, so it is laid in cooler hours. The fix: repair cracks and weak areas, test moisture, then a suitable primer and an epoxy system thick enough for the traffic.
- Main roads
- • King Fahd bin Abdulaziz Road
- Common buildings
- • villas
- • shops and commercial buildings
Materials and specifications
- Epoxy primer: Seals the concrete pores and bonds the system; its type depends on slab moisture and porosity.
- Roller-applied epoxy coating: Two thin coats for majlis rooms, diwaniyas, offices and light-traffic storage.
- Self-levelling epoxy: A smooth seamless surface a few millimetres thick for showrooms, corridors, hospitals and kitchens.
- Epoxy mortar with quartz sand: For heavy loads, forklifts and car parks; can be textured for slip resistance.
- Aliphatic polyurethane topcoat: Improves scratch resistance and colour stability where light exposure is high, depending on the system.
We select products conforming to the relevant Saudi standards and apply them per the manufacturer's datasheet.
Execution plan in Ar Rawdah
- Assess the floor: concrete age, surface strength and moisture using the tests set in the system's data sheet
- Prepare the surface mechanically by grinding or shot-blasting, then vacuum all dust
- Repair cracks, holes and construction joints with epoxy filler or mortar
- Apply the primer, respecting surface temperature and dew-point margin
- Apply the system coats at the specified consumption and thickness, broadcasting sand for slip-resistant finishes
- Apply the topcoat and close the area until full cure before traffic and loads
Indicative prices for typical Ar Rawdah sizes
| Case | Size | Estimated cost (SAR) | Warranty |
|---|---|---|---|
| Smaller | 50 m² | 2,000 – 6,000 | Written, by work type |
| Typical | 125 m² | 4,400 – 15,000 | Written, by work type |
| Larger | 200 m² | 7,000 – 24,000 | Written, by work type |
Indicative ranges excluding VAT, based on sizes common in the district; not a quote. Final price after inspection.
Questions from Ar Rawdah residents
How much does epoxy flooring cost for a villa in Ar Rawdah, Sakaka?
In Ar Rawdah, for about 150 m² the indicative cost is SAR 5,250–18,000 before VAT (SAR 35–120 per m²). Prices are indicative and confirmed after inspection according to condition, material and access.
Which material is used for epoxy flooring in Ar Rawdah?
Two-coat epoxy for light use, self-levelling for clean areas, and quartz screed for heavy loads and traffic.
How long does epoxy flooring take in Ar Rawdah, and do you serve it?
The work takes typically two to five days including preparation, coats and curing before use. We serve Sakaka on request; once we receive your request from Ar Rawdah we coordinate a date by team availability and confirm it first.
Book an inspection in Ar Rawdah
Details are pre-filled from this page; add only what's specific to you, and your message reaches us neatly on WhatsApp.
Nothing is stored on this website; your message opens in WhatsApp for you to send to 0544027180. Privacy policy