Roof Insulation in Ash Shati 3, Al Qunfudhah
Azl — delivered with a written warranty, to the Saudi Building Code
About Ash Shati 3
Ash Shati 3 is among the newest coastal plans in northern Al Qunfudhah, with some plots less than two hundred metres from the sea and near the corniche; it consists mostly of residential plots for building on Lari Street and Al-Shati Street, with a few first homes. Its closeness to the sea makes salt-resistant waterproofing and rebar protection a priority, along with pre-construction soil treatment against termites. District guide
Why Ash Shati 3 homes need roof insulation
Ash Shati 3 lies in Al Qunfudhah along Lari Street and Al-Shati Street, and is dominated by villas. Villa roofs are wide, multi-level and crowded with AC bases and annexes, and every joint or opening is a weak point for rain or AC condensate. Being near the sea means humidity and salt that speed rebar corrosion and affect curing, so surface moisture and dew point are checked before any application. Many buildings in the district are under construction, and the best time to insulate is before tiling and backfill, with a flood test before covering. The fix: an integrated waterproof and thermal system turned up the parapets, detailing every base and opening, then a flood test before covering.
- Main roads
- • Lari Street
- • Al-Shati Street
- Nearby landmarks
- • Al Qunfudhah Corniche
- Common buildings
- • villas
Materials and specifications
- Bituminous membrane (rolls): Durable torch-applied waterproofing, suited to large concrete roofs.
- Spray polyurethane foam: Seamless thermal and waterproof layer in one; needs a UV-protective topcoat.
- Liquid acrylic or polyurethane coating: Flexible layer ideal for maintenance and detailed roofs.
- Extruded polystyrene boards (XPS): Compression-resistant thermal insulation under tiles.
We select products conforming to the relevant Saudi standards and apply them per the manufacturer's datasheet.
Execution plan in Ash Shati 3
- Inspect the roof, measure the area and check slopes and drains
- Clean the surface, remove failed insulation and treat cracks
- Apply primer to ensure adhesion
- Install the waterproofing layer and turn it up the parapet walls
- Flood-test with water long enough to confirm no leaks
- Install thermal insulation and the protection layer or tiles
Indicative prices for typical Ash Shati 3 sizes
| Case | Size | Estimated cost (SAR) | Warranty |
|---|---|---|---|
| Smaller | 250 m² | 11,250 – 21,250 | Written, by work type |
| Typical | 375 m² | 16,900 – 31,900 | Written, by work type |
| Larger | 500 m² | 22,500 – 42,500 | Written, by work type |
Indicative ranges excluding VAT, based on sizes common in the district; not a quote. Final price after inspection.
Questions from Ash Shati 3 residents
How much does roof insulation cost for a villa in Ash Shati 3, Al Qunfudhah?
In Ash Shati 3, for about 400 m² the indicative cost is SAR 18,000–34,000 before VAT (SAR 45–85 per m²). Prices are indicative and confirmed after inspection according to condition, material and access.
Which material is used for roof insulation in Ash Shati 3?
Commonly a bituminous or liquid membrane plus a thermal layer (foam or XPS) and protection, with thickness set by the thermal calculation. Near Al Qunfudhah Corniche we also plan access and working hours.
How long does roof insulation take in Ash Shati 3, and do you serve it?
The work takes typically two days to a week depending on area, layers and the flood test. We serve Al Qunfudhah on request; once we receive your request from Ash Shati 3 we coordinate a date by team availability and confirm it first.
Book an inspection in Ash Shati 3
Details are pre-filled from this page; add only what's specific to you, and your message reaches us neatly on WhatsApp.
Nothing is stored on this website; your message opens in WhatsApp for you to send to 0544027180. Privacy policy