Roof Insulation in King Salman, Riyadh
Azl — delivered with a written warranty, to the Saudi Building Code
About King Salman
King Salman District was announced in 2023 by merging Al Wahah and Salah Ad Din, running south of King Abdullah Road down to Al Orouba Road, with Othman bin Affan Road on the former Al Wahah side. Its villas and flats have stood for years amid a humanisation programme, and renewing roof waterproofing and thermal insulation is a natural part of upgrading these homes. District guide
Why King Salman homes need roof insulation
King Salman lies in north Riyadh along King Abdullah Road and Al Orouba Road, and is dominated by villas and apartment buildings. Villa roofs are wide, multi-level and crowded with AC bases and annexes, and every joint or opening is a weak point for rain or AC condensate. Intense heat most of the year makes roof thermal insulation a core part of the solution, not an optional extra. The fix: assess the existing system with a moisture survey; restore over it if dry, or strip and rebuild if saturated.
- Main roads
- • King Abdullah Road
- • Al Orouba Road
- • Othman bin Affan Road
- Common buildings
- • villas
- • apartment buildings
Materials and specifications
- Bituminous membrane (rolls): Durable torch-applied waterproofing, suited to large concrete roofs.
- Spray polyurethane foam: Seamless thermal and waterproof layer in one; needs a UV-protective topcoat.
- Liquid acrylic or polyurethane coating: Flexible layer ideal for maintenance and detailed roofs.
- Extruded polystyrene boards (XPS): Compression-resistant thermal insulation under tiles.
We select products conforming to the relevant Saudi standards and apply them per the manufacturer's datasheet.
Execution plan in King Salman
- Inspect the roof, measure the area and check slopes and drains
- Clean the surface, remove failed insulation and treat cracks
- Apply primer to ensure adhesion
- Install the waterproofing layer and turn it up the parapet walls
- Flood-test with water long enough to confirm no leaks
- Install thermal insulation and the protection layer or tiles
Indicative prices for typical King Salman sizes
| Case | Size | Estimated cost (SAR) | Warranty |
|---|---|---|---|
| Smaller | 250 m² | 11,250 – 21,250 | Written, by work type |
| Typical | 375 m² | 16,900 – 31,900 | Written, by work type |
| Larger | 500 m² | 22,500 – 42,500 | Written, by work type |
Indicative ranges excluding VAT, based on sizes common in the district; not a quote. Final price after inspection.
Questions from King Salman residents
How much does roof insulation cost for a villa in King Salman, Riyadh?
In King Salman, for about 400 m² the indicative cost is SAR 18,000–34,000 before VAT (SAR 45–85 per m²). Prices are indicative and confirmed after inspection according to condition, material and access.
Which material is used for roof insulation in King Salman?
Commonly a bituminous or liquid membrane plus a thermal layer (foam or XPS) and protection, with thickness set by the thermal calculation.
How long does roof insulation take in King Salman, and do you serve it?
The work takes typically two days to a week depending on area, layers and the flood test. Riyadh is one of the cities we serve directly; the inspection in King Salman is scheduled by team availability.
Book an inspection in King Salman
Details are pre-filled from this page; add only what's specific to you, and your message reaches us neatly on WhatsApp.
Nothing is stored on this website; your message opens in WhatsApp for you to send to 0544027180. Privacy policy