Roof Insulation in Al-Muruj, Hafr Al-Batin
Azl — delivered with a written warranty, to the Saudi Building Code
About Al-Muruj
Al-Muruj is a small, quiet residential district of about 2.9 square kilometres running along Abu Bakr As-Siddiq Road on its northern edge, next to Al-Musaif. Family villas dominate, some still under construction, which allows under-tile waterproofing and wall and roof thermal insulation to be built in during construction rather than added later. District guide
Why Al-Muruj homes need roof insulation
Al-Muruj in south Hafr Al-Batin is home to villas, connected by Abu Bakr As-Siddiq Road. Villa roofs are wide, multi-level and crowded with AC bases and annexes, and every joint or opening is a weak point for rain or AC condensate. The city's cold winters and hot summers cause repeated expansion and contraction, so a flexible system is preferred. Intense heat most of the year makes roof thermal insulation a core part of the solution, not an optional extra. The fix: an integrated waterproof and thermal system turned up the parapets, detailing every base and opening, then a flood test before covering.
- Main roads
- • Abu Bakr As-Siddiq Road
- • Al-Ahnaf bin Qais Street
- Common buildings
- • villas
Materials and specifications
- Bituminous membrane (rolls): Durable torch-applied waterproofing, suited to large concrete roofs.
- Spray polyurethane foam: Seamless thermal and waterproof layer in one; needs a UV-protective topcoat.
- Liquid acrylic or polyurethane coating: Flexible layer ideal for maintenance and detailed roofs.
- Extruded polystyrene boards (XPS): Compression-resistant thermal insulation under tiles.
We select products conforming to the relevant Saudi standards and apply them per the manufacturer's datasheet.
Execution plan in Al-Muruj
- Inspect the roof, measure the area and check slopes and drains
- Clean the surface, remove failed insulation and treat cracks
- Apply primer to ensure adhesion
- Install the waterproofing layer and turn it up the parapet walls
- Flood-test with water long enough to confirm no leaks
- Install thermal insulation and the protection layer or tiles
Indicative prices for typical Al-Muruj sizes
| Case | Size | Estimated cost (SAR) | Warranty |
|---|---|---|---|
| Smaller | 250 m² | 11,250 – 21,250 | Written, by work type |
| Typical | 375 m² | 16,900 – 31,900 | Written, by work type |
| Larger | 500 m² | 22,500 – 42,500 | Written, by work type |
Indicative ranges excluding VAT, based on sizes common in the district; not a quote. Final price after inspection.
Questions from Al-Muruj residents
How much does roof insulation cost for a villa in Al-Muruj, Hafr Al-Batin?
In Al-Muruj, for about 400 m² the indicative cost is SAR 18,000–34,000 before VAT (SAR 45–85 per m²). Prices are indicative and confirmed after inspection according to condition, material and access.
Which system suits roof insulation in Al-Muruj?
Commonly a bituminous or liquid membrane plus a thermal layer (foam or XPS) and protection, with thickness set by the thermal calculation.
How long does roof insulation take in Al-Muruj, and do you serve it?
The work takes typically two days to a week depending on area, layers and the flood test. We serve Hafr Al-Batin on request; once we receive your request from Al-Muruj we coordinate a date by team availability and confirm it first.
Book an inspection in Al-Muruj
Details are pre-filled from this page; add only what's specific to you, and your message reaches us neatly on WhatsApp.
Nothing is stored on this website; your message opens in WhatsApp for you to send to 0544027180. Privacy policy