Azl logo — azl.com.sa
Ash Shifa — HailModern, villa-dominated district

Roof Insulation in Ash Shifa, Hail

Azl — delivered with a written warranty, to the Saudi Building Code

About Ash Shifa

Ash Shifa in Hail lies between An Nuqrah and Ar Rasf with a modern plan, next to As Salam and Al Aziziyah; King Faisal Street is a main artery and it connects to King Abdulaziz Road. Villas, apartments and shops are all present, and its modern villas with exposed roofs benefit from layered thermal insulation plus a waterproof layer protecting the slab from winter rain. District guide

Why Ash Shifa homes need roof insulation

Ash Shifa lies in Hail along King Faisal Street and King Abdulaziz Road, and is dominated by villas, apartment buildings and shops and commercial buildings. Villa roofs are wide, multi-level and crowded with AC bases and annexes, and every joint or opening is a weak point for rain or AC condensate. The city's cold winters and hot summers cause repeated expansion and contraction, so a flexible system is preferred. Intense heat most of the year makes roof thermal insulation a core part of the solution, not an optional extra. The fix: an integrated waterproof and thermal system turned up the parapets, detailing every base and opening, then a flood test before covering.

Main roads
  • • King Faisal Street
  • • King Abdulaziz Road
Common buildings
  • • villas
  • • apartment buildings
  • • shops and commercial buildings

Materials and specifications

  • Bituminous membrane (rolls): Durable torch-applied waterproofing, suited to large concrete roofs.
  • Spray polyurethane foam: Seamless thermal and waterproof layer in one; needs a UV-protective topcoat.
  • Liquid acrylic or polyurethane coating: Flexible layer ideal for maintenance and detailed roofs.
  • Extruded polystyrene boards (XPS): Compression-resistant thermal insulation under tiles.

We select products conforming to the relevant Saudi standards and apply them per the manufacturer's datasheet.

Execution plan in Ash Shifa

  1. Inspect the roof, measure the area and check slopes and drains
  2. Clean the surface, remove failed insulation and treat cracks
  3. Apply primer to ensure adhesion
  4. Install the waterproofing layer and turn it up the parapet walls
  5. Flood-test with water long enough to confirm no leaks
  6. Install thermal insulation and the protection layer or tiles

Indicative prices for typical Ash Shifa sizes

CaseSizeEstimated cost (SAR)Warranty
Smaller250 m²11,250 – 21,250Written, by work type
Typical375 m²16,900 – 31,900Written, by work type
Larger500 m²22,500 – 42,500Written, by work type

Indicative ranges excluding VAT, based on sizes common in the district; not a quote. Final price after inspection.

Approximate area375 m²
Current surface condition

Questions from Ash Shifa residents

How much does roof insulation cost for a villa in Ash Shifa, Hail?

In Ash Shifa, for about 400 m² the indicative cost is SAR 18,000–34,000 before VAT (SAR 45–85 per m²). Prices are indicative and confirmed after inspection according to condition, material and access.

Which material is used for roof insulation in Ash Shifa?

Commonly a bituminous or liquid membrane plus a thermal layer (foam or XPS) and protection, with thickness set by the thermal calculation.

How long does roof insulation take in Ash Shifa, and do you serve it?

The work takes typically two days to a week depending on area, layers and the flood test. Hail is one of the cities we serve directly; the inspection in Ash Shifa is scheduled by team availability.

Book an inspection in Ash Shifa

Details are pre-filled from this page; add only what's specific to you, and your message reaches us neatly on WhatsApp.

Nothing is stored on this website; your message opens in WhatsApp for you to send to 0544027180. Privacy policy