Azl logo — azl.com.sa
Al-Ta'akhi — West YanbuMixed residential–commercial district

Roof Insulation in Al-Ta'akhi, Yanbu

Azl — delivered with a written warranty, to the Saudi Building Code

About Al-Ta'akhi

Al-Ta'akhi sits near Yanbu Commercial Port with direct beach access via Prince Muqrin bin Abdulaziz Road, keeping a quiet character despite the port, with hotels, leisure venues and basic services. Exposure to salty sea air makes roof waterproofing and protective façade coatings a priority to limit corrosion and plaster spalling. District guide

Why Al-Ta'akhi homes need roof insulation

Al-Ta'akhi in west Yanbu is home to apartment buildings and shops and commercial buildings, connected by Prince Muqrin bin Abdulaziz Road. An apartment building's roof is shared and crowded with AC units and flat tanks, so top-floor residents bear both the heat and the leaks. Being near the sea means humidity and salt that speed rebar corrosion and affect curing, so surface moisture and dew point are checked before any application. Intense heat most of the year makes roof thermal insulation a core part of the solution, not an optional extra. The fix: a system that tolerates maintenance traffic on equipment-crowded roofs, with precise detailing around bases and penetrations.

Main roads
  • • Prince Muqrin bin Abdulaziz Road
Nearby landmarks
  • • Yanbu Commercial Port
Common buildings
  • • apartment buildings
  • • shops and commercial buildings

Materials and specifications

  • Bituminous membrane (rolls): Durable torch-applied waterproofing, suited to large concrete roofs.
  • Spray polyurethane foam: Seamless thermal and waterproof layer in one; needs a UV-protective topcoat.
  • Liquid acrylic or polyurethane coating: Flexible layer ideal for maintenance and detailed roofs.
  • Extruded polystyrene boards (XPS): Compression-resistant thermal insulation under tiles.

We select products conforming to the relevant Saudi standards and apply them per the manufacturer's datasheet.

Execution plan in Al-Ta'akhi

  1. Inspect the roof, measure the area and check slopes and drains
  2. Clean the surface, remove failed insulation and treat cracks
  3. Apply primer to ensure adhesion
  4. Install the waterproofing layer and turn it up the parapet walls
  5. Flood-test with water long enough to confirm no leaks
  6. Install thermal insulation and the protection layer or tiles

Indicative prices for typical Al-Ta'akhi sizes

CaseSizeEstimated cost (SAR)Warranty
Smaller300 m²13,500 – 25,500Written, by work type
Typical500 m²22,500 – 42,500Written, by work type
Larger700 m²31,500 – 59,500Written, by work type

Indicative ranges excluding VAT, based on sizes common in the district; not a quote. Final price after inspection.

Approximate area500 m²
Current surface condition

Questions from Al-Ta'akhi residents

How much does roof insulation cost for an apartment building in Al-Ta'akhi, Yanbu?

In Al-Ta'akhi, for about 500 m² the indicative cost is SAR 22,500–42,500 before VAT (SAR 45–85 per m²). Prices are indicative and confirmed after inspection according to condition, material and access.

Which system suits roof insulation in Al-Ta'akhi?

Commonly a bituminous or liquid membrane plus a thermal layer (foam or XPS) and protection, with thickness set by the thermal calculation. Near Yanbu Commercial Port we also plan access and working hours.

How long does roof insulation take in Al-Ta'akhi, and do you serve it?

The work takes typically two days to a week depending on area, layers and the flood test. We serve Yanbu on request; once we receive your request from Al-Ta'akhi we coordinate a date by team availability and confirm it first.

Book an inspection in Al-Ta'akhi

Details are pre-filled from this page; add only what's specific to you, and your message reaches us neatly on WhatsApp.

Nothing is stored on this website; your message opens in WhatsApp for you to send to 0544027180. Privacy policy