Epoxy Flooring & Coatings in An Nawwariyah, Makkah
Azl — delivered with a written warranty, to the Saudi Building Code
About An Nawwariyah
An Nawwariyah is a suburb north of Makkah on Madinah Road outside the Haram boundary. Once watermelon farms and red-brick factories, it is now a modern district of villas and apartment blocks near a wadi where residents have asked for a flood-protection dam. That makes foundation and roof waterproofing and good rainwater drainage essential, alongside thermal insulation for new villas. District guide
Why An Nawwariyah homes need epoxy flooring & coatings
An Nawwariyah lies in north Makkah along Madinah Road and Fourth Ring Road, and is dominated by villas and apartment buildings. In villas epoxy is usually requested for the garage, store and laundry, sometimes for annexes and majlis rooms in glossy easy-clean systems. Many buildings in the district are under construction, and the best time to insulate is before tiling and backfill, with a flood test before covering. Sitting near a wadi means storm and rain water may collect in places, so falls and drainage are reviewed before insulating. The fix: mechanical preparation and moisture testing, then an epoxy system matched to the use.
- Main roads
- • Madinah Road
- • Fourth Ring Road
- Common buildings
- • villas
- • apartment buildings
Materials and specifications
- Epoxy primer: Seals the concrete pores and bonds the system; its type depends on slab moisture and porosity.
- Roller-applied epoxy coating: Two thin coats for majlis rooms, diwaniyas, offices and light-traffic storage.
- Self-levelling epoxy: A smooth seamless surface a few millimetres thick for showrooms, corridors, hospitals and kitchens.
- Epoxy mortar with quartz sand: For heavy loads, forklifts and car parks; can be textured for slip resistance.
- Aliphatic polyurethane topcoat: Improves scratch resistance and colour stability where light exposure is high, depending on the system.
We select products conforming to the relevant Saudi standards and apply them per the manufacturer's datasheet.
Execution plan in An Nawwariyah
- Assess the floor: concrete age, surface strength and moisture using the tests set in the system's data sheet
- Prepare the surface mechanically by grinding or shot-blasting, then vacuum all dust
- Repair cracks, holes and construction joints with epoxy filler or mortar
- Apply the primer, respecting surface temperature and dew-point margin
- Apply the system coats at the specified consumption and thickness, broadcasting sand for slip-resistant finishes
- Apply the topcoat and close the area until full cure before traffic and loads
Indicative prices for typical An Nawwariyah sizes
| Case | Size | Estimated cost (SAR) | Warranty |
|---|---|---|---|
| Smaller | 50 m² | 2,000 – 6,000 | Written, by work type |
| Typical | 125 m² | 4,400 – 15,000 | Written, by work type |
| Larger | 200 m² | 7,000 – 24,000 | Written, by work type |
Indicative ranges excluding VAT, based on sizes common in the district; not a quote. Final price after inspection.
Questions from An Nawwariyah residents
How much does epoxy flooring cost for a villa in An Nawwariyah, Makkah?
In An Nawwariyah, for about 150 m² the indicative cost is SAR 5,250–18,000 before VAT (SAR 35–120 per m²). Prices are indicative and confirmed after inspection according to condition, material and access.
Which system suits epoxy flooring in An Nawwariyah?
Two-coat epoxy for light use, self-levelling for clean areas, and quartz screed for heavy loads and traffic.
How long does epoxy flooring take in An Nawwariyah, and do you serve it?
The work takes typically two to five days including preparation, coats and curing before use. Makkah is one of the cities we serve directly; the inspection in An Nawwariyah is scheduled by team availability.
Book an inspection in An Nawwariyah
Details are pre-filled from this page; add only what's specific to you, and your message reaches us neatly on WhatsApp.
Nothing is stored on this website; your message opens in WhatsApp for you to send to 0544027180. Privacy policy